Gran Jurado del Condado de El Dorado

2002-2003

44 informes

From the annual report
The consolidated year-end volume. The individual investigations it contains are listed separately below.
📑 Year-End Report
The full consolidated volume; individual reports are listed below.
Individual reports (44)
Hallazgos & Recomendaciones 13 hallazgos
F1: The District Attorney involved himself in “Friend’s” Court proceedings with the Complainant.
F2: The District Attorney’s Office continues to handle “Friend’s” son’s criminal cases resulting in the appearance of impropriety to the public.
Recomendaciones relacionadas (2)
R5: To avoid the appearance of a conflict of interest, the District Attorney should set up a written protocol regarding cases whenever the accused is related to or has a relationship with an employee in the District Attorney’s Office, including the District Attorney.
R6: The El Dorado County Board of Supervisors should revise the County’s nepotism policy to include “significant others.” Responses Required for Recommendations
F3: The District Attorney did not follow his office procedures relating to the logging in and custody of “Friend’s” weapon.
F4: The District Attorney has $1,254.00 in his personal office safe for eight years and cannot explain this.
Recomendaciones relacionadas (1)
R4: All cash received should be maintained in “double” custody.
F5: The District Attorney does not maintain a complete and proper evidence log of the contents of his personal office safe.
Recomendaciones relacionadas (2)
R2: The District Attorney should establish written procedures pertaining to his “personal” safe whereby all items are properly logged in and out with the appropriate detailed information.
R3: The personal safe and evidence locker should be audited annually.
F6: The District Attorney hired “Friend” to work in his office on several occasions, most recently December 2002, while involved in a personal relationship with her.
F7: The District Attorney’s “Friend” working in his office has created a perception of favoritism and an adverse effect on staff morale. PROFESSIONALISM, A Sourcebook of Ethics and Civil Liability Principles for Prosecutors, by the Ethic Committee of the California District Attorneys Association; Chapter X, Page X-1. 30
Recomendaciones relacionadas (2)
R5: To avoid the appearance of a conflict of interest, the District Attorney should set up a written protocol regarding cases whenever the accused is related to or has a relationship with an employee in the District Attorney’s Office, including the District Attorney.
R6: The El Dorado County Board of Supervisors should revise the County’s nepotism policy to include “significant others.” Responses Required for Recommendations
F8: The District Attorney had an ex parte communication with a Court Commissioner in violation of Rule 5-300 of the California Rules of Professional Conduct for attorneys.
F9: The District Attorney misled a Court Commissioner with a false statement of fact in violation of Business & Professions Code, Section 6068 (d).
Recomendaciones relacionadas (1)
R1: through R5 El Dorado County District Attorney
F10: The District Attorney misrepresented facts regarding his communication with the Commissioner to the State Bar of California and to this Grand Jury.
F11: The District Attorney sent a letter to the Grand Jury misquoting Rule 5-300 of the California Rules of Professional Conduct for attorneys.
F12: Sworn testimony by the District Attorney and other witnesses conflicts in important and significant details.
F13: Portions of the District Attorney’s testimony and documentation were found to be lacking in truth and veracity.
Hallazgos & Recomendaciones 8 hallazgos
F1: Required funding for CalPERS has dramatically increase due to legislative formulae.
Recomendaciones relacionadas (1)
R1: The CAO and the Board of Supervisors should immediately initiate a process to resolve the CalPers funding issue.
F2: The Department of Social Services still has eleven deficit trust funds.
Recomendaciones relacionadas (2)
R2: All financial issues, which have potential impact regarding the County’s finances, should receive constant and sedulous attention from the Chief Administrative Officer and the Auditor/Controller’s Office.
R3: County Counsel and the Auditor/Controller should communicate on matters impacting the future of the County legally and financially with review and execution by the Chief Administrative Officer and the Board of Supervisors.
F3: The Auditor/Controller Office has not been consistent in the reporting of trust funds in deficit condition since 1988. 91
Recomendaciones relacionadas (2)
R2: All financial issues, which have potential impact regarding the County’s finances, should receive constant and sedulous attention from the Chief Administrative Officer and the Auditor/Controller’s Office.
R3: County Counsel and the Auditor/Controller should communicate on matters impacting the future of the County legally and financially with review and execution by the Chief Administrative Officer and the Board of Supervisors.
F4: Most County departments have Accounting Officers, but not professional accountants who would understand the technical scope of the work.
Recomendaciones relacionadas (3)
R2: All financial issues, which have potential impact regarding the County’s finances, should receive constant and sedulous attention from the Chief Administrative Officer and the Auditor/Controller’s Office.
R3: County Counsel and the Auditor/Controller should communicate on matters impacting the future of the County legally and financially with review and execution by the Chief Administrative Officer and the Board of Supervisors.
R4: Director of Human Resources, the Auditor/Controller, and the Chief Administrative Officer should study and recommend to the Board of Supervisors a new job classification series that would encourage the recruitment of more qualified accounting personnel in the Departments.
F5: The current Auditor/Controller knew of the alleged trust account deficit since 1995; obviously prior to requesting the Board of Supervisors to authorize covering the account deficit from General Fund monies ($958,000).
Recomendaciones relacionadas (2)
R2: All financial issues, which have potential impact regarding the County’s finances, should receive constant and sedulous attention from the Chief Administrative Officer and the Auditor/Controller’s Office.
R3: County Counsel and the Auditor/Controller should communicate on matters impacting the future of the County legally and financially with review and execution by the Chief Administrative Officer and the Board of Supervisors.
F6: The Board of Supervisors reviewed and agreed to transfer allocated monies during 2002/2003 for the deficit trust funds without a full investigation by the Auditor/Controller
Recomendaciones relacionadas (2)
R2: All financial issues, which have potential impact regarding the County’s finances, should receive constant and sedulous attention from the Chief Administrative Officer and the Auditor/Controller’s Office.
R3: County Counsel and the Auditor/Controller should communicate on matters impacting the future of the County legally and financially with review and execution by the Chief Administrative Officer and the Board of Supervisors.
F7: All but the Department of Social Service have deficit trust funds that are now accounted for and balanced (See attached Addendum provided by the Auditor/Controller Office).
F8: Funds allocated to Risk Management have on one occasion been utilized to balance the County budget.
Recomendaciones relacionadas (3)
R2: All financial issues, which have potential impact regarding the County’s finances, should receive constant and sedulous attention from the Chief Administrative Officer and the Auditor/Controller’s Office.
R3: County Counsel and the Auditor/Controller should communicate on matters impacting the future of the County legally and financially with review and execution by the Chief Administrative Officer and the Board of Supervisors.
R5: Risk Management funds should not be used to balance the County budget.

Hallazgos y recomendaciones aún no extraídos.

Hallazgos y recomendaciones aún no extraídos.

Hallazgos y recomendaciones aún no extraídos.

Hallazgos & Recomendaciones 8 hallazgos
F1: The prisoners’ entrance door is rusting.
Recomendaciones relacionadas (1)
R1: The prisoners’ entrance door should be repaired and painted.
F2: The prisoners’ entrance wooden door frame is deteriorating.
Recomendaciones relacionadas (1)
R2: The prisoners’ entrance door frame should be repaired.
F3: The downspouts at rear of the building are not connected to the drainage field pipes. 148
Recomendaciones relacionadas (1)
R3: The downspouts at rear of the building should be reconnected to the drainage field pipes.
F4: The rain gutters are full of leaves and pine needles.
Recomendaciones relacionadas (1)
R4: The rain gutters should be cleaned.
F5: The HVAC vents/registers are dirty.
Recomendaciones relacionadas (1)
R5: The HVAC vents/registers should be periodically cleaned.
F6: The courtroom ceiling tiles are water stained.
Recomendaciones relacionadas (1)
R6: The source of the water staining the ceiling tiles of the courtroom should be investigated and repairs should be made.
F7: The courtroom and office area walls have cracks.
Recomendaciones relacionadas (1)
R7: The cracks in the courtroom and office area walls should be repaired.
F8: The drinking fountain fascia plate is improperly attached.
Recomendaciones relacionadas (1)
R8: The drinking fountain fascia plate should be properly reattached. Responses Required for Findings
Hallazgos & Recomendaciones 20 hallazgos
F1: The roofline corbel brackets and tiles are loose, missing, and/or in poor repair.
Recomendaciones relacionadas (1)
R1: Roofline corbel brackets and tiles should be replaced or repaired.
F2: Valuable parking space has been lost, due to the danger of falling corbel brackets and tiles.
F3: The parking lot is inadequate.
Recomendaciones relacionadas (1)
R2: Adequate parking should be provided
F4: Mold and mildew are growing on the shaded exterior side of the building walls and windows.
Recomendaciones relacionadas (1)
R3: Mold and mildew should be removed from the exterior building walls and windows.
F5: The door and window frames on the exterior shaded side of the building are rusting.
Recomendaciones relacionadas (1)
R4: Rusted exterior door and window frames should be properly repaired and maintained.
F6: The fire escape metal structure is rusting and the landings are dirty.
Recomendaciones relacionadas (1)
R5: Rusted fire escape metal structures should be properly repaired and maintained.
F7: The exterior plaster area around basement windows is deteriorating.
Recomendaciones relacionadas (1)
R6: The exterior plaster area around windows should be properly repaired.
F8: Some exterior wall tiles are damaged.
Recomendaciones relacionadas (1)
R7: Damaged exterior tiles should be replaced.
F9: The awning over the rear door entry is damaged.
Recomendaciones relacionadas (1)
R8: The rear door awning should be repaired.
F10: The handicap sign on the front wall near the sidewalk is bent outward and is a potential liability.
Recomendaciones relacionadas (1)
R9: The bent handicap sign on the front wall near the sidewalk should be replaced.
F11: The security checkpoint is inadequate room for heavy traffic situations.
F12: The space in the three lobbies is inadequate for current use.
F13: The office areas are extremely cramped and lack storage space.
F14: No fire protection sprinkler systems or smoke detectors exist throughout the building.
F15: Some fire extinguisher locations are not clearly marked.
Recomendaciones relacionadas (1)
R10: Fire extinguisher locations should be clearly marked. R 11. Fire drills should be periodically conducted.
F16: No fire drills are held.
Recomendaciones relacionadas (1)
R11: Fire drills should be periodically conducted. R12. The lighting fixtures diffusers should be properly installed and/or replaced as necessary. R13. Air circulation should be reviewed to ensure a healthy working environment. R14. When juvenile cares are on calendar, restrooms should be monitored. Responses Required for Findings F1 through F20 El Dorado County Board of Supervisors El Dorado County Department of General Services Chief Executive Officer for Superior Court Responses Required for Recommendations R1 through R14 El Dorado County Board of Supervisors El Dorado County Department of General Services Chief Executive Officer for Superior Court 153
F17: The light diffusers on some lighting fixtures are sagging and ill fitted. In addition, one diffuser is missing in the CASA children’s room. 151
Recomendaciones relacionadas (1)
R12: The lighting fixtures diffusers should be properly installed and/or replaced as necessary.
F18: Air circulation is inconsistent and makeshift throughout the building.
Recomendaciones relacionadas (1)
R13: Air circulation should be reviewed to ensure a healthy working environment.
F19: Several employees are concerned about the perceived unhealthy working environment in the building.
Recomendaciones relacionadas (1)
R13: Air circulation should be reviewed to ensure a healthy working environment.
F20: Employees are concerned that the restroom configuration results in vandalism by the public and inconvenient for them.
Recomendaciones relacionadas (1)
R14: When juvenile cares are on calendar, restrooms should be monitored. Responses Required for Findings
Hallazgos & Recomendaciones 5 hallazgos
F1: The City of South Lake Tahoe voters passed Measure Z on November 5, 2002 to add an additional $1 dollar tax to the already existing TOT collection
F2: The City Manager mailed an announcement to all owners or managers of motel, hotel, and vacation rentals that the measure would become effective on December 5, 2002.
F3: The South Lake Tahoe City Council members unanimously voted on December 10, 2002 that these additional tax monies that were collected between December 5, 2002 and January 1, 2003 would not be audited.
F4: The Council vote allowed the lodging industry to retain, refund, or pay the tax for the 26 days that were not being audited.
F5: The City of South Lake Tahoe incurred an estimated loss of approximately $22,038 as a result of the above action.
Recomendaciones adicionales 2

No vinculadas a hallazgos específicos.

R1: The City Council should follow the “six P’s”:Proper Prior Planning Prevents Poor Performance.
R2: The ballot measure, once voted and approved, should have gone into effect within 30 days according to election laws. Responses Required for Findings
Hallazgos & Recomendaciones 4 hallazgos
F1: A complaint languished in the District Attorney’s Office for 15 months before being investigated. 85
Recomendaciones relacionadas (1)
R1: The District Attorney’s Office needs written procedures and policies for handling and tracking complaints in a timely and professional manner.
F2: Written policy and procedures for handling complaints to the District Attorney’s Office appear to be inadequate.
Recomendaciones relacionadas (1)
R2: The District Attorney should assign one of his staff to be responsible for community relations to facilitate an open door policy between the public and his office.
F3: Several staff members, including the District Attorney, mentioned the office is understaffed. It appears to be a waste of taxpayer’s monies for attorneys to perform clerical duties and, as a result, not have enough time to respond to the concerns of the public and their prosecutorial duties.
Recomendaciones relacionadas (1)
R3: All relevant employees in the District Attorney’s Office should be fully trained in the DAMION system.
F4: The DAMION case management system, installed in June 2001, does not appear to be utilized to its full potential.
Recomendaciones relacionadas (1)
R4: The Mobile Home Task Force should investigate and mediate mobile home park issues. This would seem to be more cost effective than litigation.
Recomendaciones adicionales 1

No vinculadas a hallazgos específicos.

R5: An Ombudsman position for senior issues needs to be established in the Department of Community Services. All matters relating to mobile homes and senior issues should be directed to this office.
Hallazgos & Recomendaciones 3 hallazgos
F1: Although the complaint was made against the County Counsel it should have been directed to the Auditor-Controller.
Recomendaciones relacionadas (1)
R1: The Auditor-Controller should respond to Public Record Act requests in a timely manner and with accurate information.
F2: The Public Record Act request was submitted in February 1999 but the complaint was made in February 2002, this request had not been satisfactorily answered.
Recomendaciones relacionadas (1)
R2: The Auditor-Controller should not attempt to shift responsibility to other departments. Responses Required for Findings
F3: On December 31, 2001, the Auditor-Controller furnished an accounting spreadsheet to the complainant showing all payments made to The Firm, but never identified a payment associated with The Firm’s start date of summer of 1995.
Hallazgos & Recomendaciones 4 hallazgos
F1: The contract as it stands does not specify a contract administrator.
Página 122
F2: The contract was negotiated for the County by the Chairman of the Board of Supervisors, assisted by County Counsel.
Página 122
F3: After also asking at least one other elected officials’ opinion and getting his endorsement the contract was endorsed unanimously by the full Board.
Página 122
F4: Fingerprints of the applicant were taken and are on file.
Página 122
Recomendaciones adicionales 4

No vinculadas a hallazgos específicos.

R1: An addendum should be added to the contract to make the Board of Supervisors the contract administrator.
Página 122
R2: The Board of Supervisors should continue to find ways to work in the best interest of the County through the establishment of a positive working relationship with the CAO.
Página 122
R3: The CAO should be aware of his or her responsibility among other things. Recognize that El Dorado County is in a state of transition. While we cling to our history, we are also confronted with the reality of change.
Página 122
R4: The Board of Supervisors shall not authorize payment of money or other compensation for performance of any service or function by a private entity except pursuant to a written contract meeting all applicable requirements of law pertaining to contracts of the County. (a) The Board of Supervisors should not authorize expenditure of County funds for membership dues or assessments in any private organization, unless the Board of Supervisors makes findings of specific public benefits anticipated to accrue to the County as a result of acquiring or renewing the membership. The text of these proposed findings shall be published in the agenda for any meeting at which such an expenditure will be considered. 103 (b) If such a membership is to be at a cost level above the minimum membership level, these findings shall include a detailed explanation of the additional public benefits to the County that are anticipated to accrue from the additional expenditure. If the additional public benefits include a particular program or service, the Board of Supervisors shall enter into a written contract with the private entity to assure conduct of the program or performance to the service during the period of the membership. (c) This provision applies to all membership purchased by the County, regardless of whether the membership is in the name of the County or in the name of an officer or employee of the County. Responses Required for Findings
Página 122
Hallazgos & Recomendaciones 19 hallazgos
F1: The building exterior paint is peeling.
Página 146
F2: The parking lot surfaces are severely checked and cracked. The parking lot surface poses a danger to users and potential liability to the county.
Página 146
F3: The parking lot directional markings contradict the parking lot traffic flow and are severely faded.
Página 146
F4: The parking lot is inadequate and limits the full use of the facility.
Página 146
F5: Sidewalk to exterior patio is cracked and uneven.
Página 146
F6: The exterior patio is visually uninviting.
Página 146
F7: The carpeting is stretched with age resulting in long ripples that may be hazardous to users and is a potential liability to the county.
Página 146
F8: Several doors have been relocated resulting in incorrect signage.
Página 146
F9: Entry/hallway ceiling tiles are sagging and hanging loose.
Página 146
F10: The interior paint is showing signs of age and wear.
Página 146
F11: The building HVAC vents and registers are dirty with the exception of the kitchen.
Página 146
F12: The hall exit sign to the sidewalk leading to the patio is not illuminated.
Página 146
F13: The dining room ceiling evidences various stages of leakage which results in a stained saggy condition.
Página 146
F14: A fire extinguisher is blocked behind the furniture in the dining room storage area.
Página 146
F15: Hair nets/hats are not worn by all food handlers.
Página 146
F16: The caulking on the kitchen hand sink is aged, cracked and discolored.
Página 146
F17: The stairwell to the basement is dirty.
Página 146
F18: The basement space is utilized, but cluttered. 127
Página 146
F19: The transit heat shield of the pottery kiln is broken in two, resulting in asbestos fiber exposure.
Página 147
Recomendaciones adicionales 18

No vinculadas a hallazgos específicos.

R1: The building exterior should be painted.
Página 147
R2: The parking lot should be repaired and resurfaced.
Página 147
R3: Directional arrows should show proper traffic flow.
Página 147
R4: The sidewalk to exterior patio should be repaired.
Página 147
R5: The carpeting should be replaced.
Página 147
R6: Incorrect signage should be removed.
Página 147
R7: Sagging and hanging ceiling tiles in entry/hallway should be replaced.
Página 147
R8: The interior should be repainted.
Página 147
R9: All HVAC vents should be cleaned.
Página 147
R10: The hall exit sign to the sidewalk leading to the patio should be repaired.
Página 147
R11: The roof should be inspected for leaks and repaired as needed.
Página 147
R12: The dining room ceiling should be replaced.
Página 147
R13: The dining room storage area fire extinguisher should be made accessible.
Página 147
R14: All kitchen food handlers should wear hair nets/hats.
Página 147
R15: The kitchen hand sink should be re-caulked.
Página 147
R16: The stairwell to the basement should be cleaned and maintained on a regular basis.
Página 147
R17: The basement clutter should be addressed.
Página 147
R18: The broken pottery kiln transite heat shield should be replaced.
Página 147
Hallazgos & Recomendaciones 7 hallazgos
F1: The Board of Supervisors delegated responsibility for negotiating the MOU to the Director of Human Resources.
Página 107
F2: Some El Dorado County personnel have not been evaluated in over eight years.
Página 107
F3: The majority of Department Directors do not annually evaluate their personnel.
Página 107
F4: Department Directors are not evaluated in a timely manner.
Página 107
F5: Human Resources does not perform reference checks on employment applications.
Página 107
F6: Human Resources does not require submission of transcripts/diploma nor do they contact former employers to verify accuracy of the experience listed on the application.
Página 107
F7: The Department Directors have the responsibility to ensure that reference checks are conducted and that other pertinent background evaluation are performed.
Página 107
Recomendaciones adicionales 7

No vinculadas a hallazgos específicos.

R1: The CAO should have an experienced contractor negotiate future Memoranda of Understanding (MOUs).
Página 107
R2: Director of Human Resources should not be a negotiator for future MOUs, but serve as a technical advisor to these negotiations
Página 107
R3: County Counsel should be accountable for reviewing all issues contained in MOUs.
Página 107
R4: The Auditor-Controller should be accountable for reviewing financial aspects for all issues that have a major financial impact on the County.
Página 107
R5: All Department Directors should be evaluated yearly by the Chief Administrative Officer.
Página 107
R6: All Department Directors should be responsible for their employee evaluations and held accountable on their evaluation. 88
Página 107
R7: Human Resources should be responsible for obtaining all records required on application transmittals. (Licenses, college transcripts, diploma’s, etc) Responses Required for Findings
Página 108
Hallazgos & Recomendaciones 19 hallazgos
F1: First front entry step is too high and there’s a separation between it and sidewalk, creating a potential liability.
Página 150
F2: The size of the parking lot is inadequate for the use of the building.
Página 150
F3: The building exterior paint is peeling.
Página 150
F4: Paint on exterior wrought iron fixtures is chipped and rusting.
Página 150
F5: The building HVAC vents/registers are dirty and pose health concerns.
Página 150
F6: The conference room and the map room are cluttered.
Página 150
F7: The conference room ceiling paint is chipping.
Página 150
F8: There is a room full of older computer equipment waiting disposition by Information Services.
Página 150
F9: Hallways are utilized for storing files.
Página 150
F10: Although there are fire drill procedures, no fire drills have been held.
Página 150
F11: The building has no fire sprinkler system. District Attorney Annex – Building 226
Página 150
F12: The exterior walls are cracked.
Página 150
F13: There is evidence of previous water leaks on the ceiling.
Página 150
F14: The building HVAC vents/registers are dirty and pose health concerns.
Página 150
F15: Although there are fire drill procedures, no fire drills have been held. Victim/Witness Program - Building
Página 150
F16: Ceiling tiles are cracked and/or chipped.
Página 151
F17: The building HVAC vents/registers are dirty and pose health concerns.
Página 151
F18: Although there are fire drill procedures, no fire drills have been held.
Página 151
F19: The premises have no fire sprinkler system.
Página 151
Recomendaciones adicionales 14

No vinculadas a hallazgos específicos.

R1: First front entry step and sidewalk should be corrected to meet current code requirements.
Página 151
R2: The building exterior and wrought iron paint should be properly maintained.
Página 151
R3: The building HVAC vents/registers should be periodically cleaned.
Página 151
R4: The conference room and map room should be clear of clutter.
Página 151
R5: The conference room ceiling paint should be properly maintained.
Página 151
R6: The unutilized older computer equipment should be removed from the building.
Página 151
R7: Fire drills should be held on a periodic basis. District Attorney – Annex – Building 226
Página 151
R8: The building HVAC vents/registers should be periodically cleaned.
Página 151
R9: The exterior walls should be properly maintained.
Página 151
R10: Water leakage source should be investigated and repaired as needed.
Página 151
R11: Fire drills should be held on a periodic basis. Victim/Witness Assistance Program – Building
Página 151
R12: The building HVAC vents/registers should be periodically cleaned.
Página 151
R13: Cracked and chipped ceiling tiles should be replaced.
Página 151
R14: Fire drills should be held on a periodic basis. Responses Required for Findings
Página 151
Hallazgos & Recomendaciones 3 hallazgos
F1: Repairs reported by 2001-2002 Grand Jury have not been accomplished.
Página 76
F2: Passage of school bonds will enable a complete remodeling of the school.
Página 76
F3: Repairs/remodeling will commence within the year. 57
Página 76
Recomendaciones adicionales 3

No vinculadas a hallazgos específicos.

R1: Repairs should be accomplished within a reasonable time frame.
Página 77
R2: Follow up with architect to confirm project is on target.
Página 77
R3: Continuous monitoring of the project should be performed by the Superintendent. Responses Required for Findings
Página 77
Hallazgos & Recomendaciones 13 hallazgos
F1: Gasoline cans are stored on open shelves in the sign shop.
Página 137
F2: The fuel dispensing facility has inadequate security, is not always locked and accountability is often based on the honor system.
Página 137
F3: The Gas Boy system has been out of order from time to time for two and one-half years.
Página 137
F4: The Gas Boy hardware and software are out-dated and difficult to maintain.
Página 137
F5: Fleet maintenance staff did not meet with the tanker truck driver to verify fuel meter.
Página 137
F6: The fuel dispensers have not been calibrated; therefore the readings are not accurate which makes cross-checking the usage and purchase of fuel impossible.
Página 137
F7: Billing for fuel usage by fleet management depends on entries made on the clipboard sheets kept at each fuel dispenser and best guesses by office employees. County departments are charges for fuel they did not use because of inaccurate accountability. 118
Página 137
F8: Not all County vehicles are marked making it difficult to differentiate between County and private vehicles at the pumps.
Página 138
F9: The gate nearest the fuel dispensers is not locked until midnight when DOT swing shift leaves at which time a combination lock is used. The combination is known by the Sheriff Deputies past and present.
Página 138
F10: An electric gate located in the rear of the yard is used after midnight and on weekends by the Sheriff Deputies. Their vehicles have remote gate openers which are permanently affixed to the visor of the patrol cars. However, to close the gate the drivers must get out of the car and use their key. This gate is frequently left open, including on weekends, exposing all DOT equipment to potential vandalism and theft.
Página 138
F11: Fleet maintenance of County vehicles is performed in a two-bay garage, one bay of which is a hydraulic lift that cannot be used for many of the county vehicles, limiting the amount of repair work capable of being performed.
Página 138
F12: Repair orders for County vehicle maintenance are manually written making it time- consuming to maintain a comprehensive maintenance record for all 600 plus County maintained vehicles.
Página 138
F13: Management of the facility does not always conduct annual performance evaluations of all personnel.
Página 138
Recomendaciones adicionales 11

No vinculadas a hallazgos específicos.

R1: Gasoline cans should be stored in closed metal cabinets.
Página 138
R2: The facility should be secure at all times. Place a video camera in the yard to video-tape the area day and night.
Página 138
R3: Replace fuel dispensers and Gas Boy so the monitoring of fuel is computer maintained and can be audited.
Página 138
R4: Replace software for Gas Boy and repair order maintenance records with updated computer programs.
Página 138
R5: Monitor the amount of fuel placed in the storage tanks during delivery.
Página 138
R6: The repair order process should be computerized
Página 138
R7: All County vehicles should be marked with clearly visible I.D. numbers, except for those used in undercover law enforcement. 119
Página 138
R8: Recode all currently used remotes and change gate pad locks.
Página 139
R9: Replace or modify the electric gate so it will automatically close after it has been opened.
Página 139
R10: Replace larger DOT hydraulic lift with the appropriate lift for maintaining the fleet vehicles.
Página 139
R11: Annual performance evaluations should be completed. Responses Required for Findings
Página 139
Hallazgos & Recomendaciones 4 hallazgos
F1: The central control booth needs new floor covering.
Página 56
F2: The antenna wire was exposed in the main hallway
Página 56
F3: Some produce was old and needed to be discarded.
Página 56
F4: Two food storage bins had cracked lids.
Página 56
Recomendaciones adicionales 4

No vinculadas a hallazgos específicos.

R1: The central control booth floor covering should be replaced.
Página 56
R2: The antenna wire in the main hall should be put in a conduit.
Página 56
R3: Produce should be checked regularly.
Página 56
R4: Cracked food storage lids should be replaced. Responses Required for Findings
Página 56
Hallazgos & Recomendaciones 4 hallazgos
F1: Prisoners are transported from South Lake Tahoe to Placerville for dental services.
Página 59
F2: The correctional officers routinely work 12 hour shifts with substantial additional overtime.
Página 59
F3: Although $31,860 was appropriated from the Criminal Justice Trust Fund in 1998 and included in the County of El Dorado Proposed Budget and Workplan (General Services Carryover Facility Projects, 98-21 South Lake Tahoe Sheriff Handicap Ramp) necessary improvements to the ramp for the disabled entrance have not been made resulting in continued safety hazard to users and potential liability to the County.
Página 59
F4: Current camera surveillance in the hallway between the jail and Court Building is not adequate.
Página 59
Recomendaciones adicionales 4

No vinculadas a hallazgos específicos.

R1: Local dental services should be utilized if appropriate.
Página 59
R2: Staffing should be adequate to minimize the need for overtime.
Página 59
R3: The ramp for the disabled should immediately be improved to meet safety conditions and the Americans with Disabilities Act ( ADA) requirements.
Página 59
R4: Camera surveillance in the hallway between the jail and Court Building should be properly and adequately upgraded. Responses Required for Findings
Página 59
Hallazgos & Recomendaciones 7 hallazgos
F1: Adequate space is not available for individual counseling.
Página 62
F2: The facility needs painting.
Página 62
F3: The baseboards in the entry, halls and general-purpose gym need to be replaced. 43
Página 62
F4: Cell #14 door window is cracked.
Página 63
F5: The HVAC vents in the classrooms are dirty.
Página 63
F6: No running water is available in the health facility room.
Página 63
F7: Air packs are not available in case of fire.
Página 63
Recomendaciones adicionales 7

No vinculadas a hallazgos específicos.

R1: The facilities should be painted.
Página 63
R2: Baseboards should be replaced as needed.
Página 63
R3: Cell #14 door window should be replaced.
Página 63
R4: The health facility room should have running hot and cold water and blankets.
Página 63
R5: The HVAC vents in the classrooms should be cleaned.
Página 63
R6: Air packs should be available in Juvenile Hall for life safety and to limit potential liability.
Página 63
R7: The staff should be trained in the use of air packs.
Página 63
Hallazgos & Recomendaciones 3 hallazgos
F1: Receipts are issued upon request for all fees paid. Larger fines and fees are tracked by the Library’s computer system.
Página 83
F2: The staff includes five and one-half full time and two part time employees.
Página 83
F3: The library is open 41 hours per week. 64
Página 83
Recomendaciones adicionales 2

No vinculadas a hallazgos específicos.

R1: The Library should post a notice that receipts are available for all amounts paid to the Library.
Página 84
R2: Employees should be scheduled to allow for extended hours of operation. Commendation The library staff should be commended for a well-run and clean facility. Responses Required for Findings
Página 84
Hallazgos & Recomendaciones 4 hallazgos
F1: Some of the floorboards in the attic above the office, which is accessible to the museum staff, are substandard and pose a safety hazard and potential liability to the County.
Página 159
F2: Although fire extinguishers and smoke detectors are visible throughout the main building, there is no fire sprinkler system.
Página 159
F3: The outside sheds are old and deteriorating.
Página 159
F4: The outdoor artifacts are exposed to the elements causing deterioration.
Página 159
Recomendaciones adicionales 4

No vinculadas a hallazgos específicos.

R1: Floorboards in the attic above the office should be strengthened or replaced.
Página 159
R2: Most outside sheds should be replaced.
Página 159
R3: All outside artifacts should be under cover and additional space and housing for artifacts are needed.
Página 159
R4: A modern zoned sprinkler system is needed to protect valuable artifacts and irreplaceable records.
Página 159
Hallazgos & Recomendaciones 2 hallazgos
F1: School districts within El Dorado County offer school bus transportation to hundreds of students each day throughout the year.
Página 68
F2: All school buses in the 17 school districts are inspected annually by a safety inspection program of the California Highway Patrol, and no substantial safety exceptions were noted during the past year. No Recommendations 49
Página 68
Hallazgos & Recomendaciones 3 hallazgos
F1: The Department of Social Services has been reorganized, so that the Division of Adult Protective Services is now under the supervision of the Director of Community Services.
Página 126
F2: Some programs within the Department of Social Services have not been actively promoted to the citizens of the county.
Página 126
F3: Child Protective Services and Child Welfare Service programs in South Lake Tahoe now operate with improved direct supervision.
Página 126
Hallazgos & Recomendaciones 7 hallazgos
F1: The waste management contractor is currently reducing the waste to landfills by 25%.
Página 143
F2: The State of California has extended the County’s required date of compliance with the State mandate to July 2005, with a good faith review to be conducted in July 2004.
Página 143
F3: The fine to the County for not meeting the mandate is $10,000 per day.
Página 143
F4: The County is reviewing its contract with the contractor.
Página 143
F5: The contractor is trucking non-recycled waste to a landfill near Reno, Nevada, and mixed recyclables to their facility near Lodi, California.
Página 143
F6: The Diamond Springs facility has new management.
Página 143
F7: The growth of the County may exceed the capacity of waste processing at the Diamond Springs facility in three or four years.
Página 143
Hallazgos & Recomendaciones 5 hallazgos
F1: A Request For Proposal (RFP) was mailed to 50 applicants. Five responded. Three were interviewed.
Página 118
F2: Profit and loss statements of the marina/store from previous years were not made available to FLLCSD Board members or potential contract bidders. 99
Página 118
F3: A Board member, whose relative was one of the parties that submitted an RFP, cast the deciding vote breaking a 2 to 2 tie awarding the contract to a family member.
Página 119
F4: The FLLCSD Charter does not have a Code of Ethics.
Página 119
F5: Ten years ago, Fallen Leaf Lake Community Services District (FLLCSD) money was “loaned” from the Fire District to park and recreation functions and has still not been repaid.
Página 119
Recomendaciones adicionales 8

No vinculadas a hallazgos específicos.

R1: The procedures under which the Fallen Leaf Lake Community Services District (FLLCSD) adopted the current contract should be reviewed by the Board.
Página 119
R2: The current FLLCSD By-laws and Charter should be reviewed and revised as needed.
Página 119
R3: A Code of Ethics for elected officers should be written and adhered to.
Página 119
R4: The FLLCSD should obtain the assistance of the Institute for Local Self-Government on Community Service Districts to complete the two prior recommendations.
Página 119
R5: FLLCSD should hire a General Manager.
Página 119
R6: The elected officers should avoid any appearance of impropriety.
Página 119
R7: Newly elected FLLCSD Directors should participate in orientation and training sessions provided by the Association of Community Services District.
Página 119
R8: Money “loaned” from the Fire Department to parks and recreation should be repaid in a timely manner.
Página 119
Hallazgos & Recomendaciones 5 hallazgos
F1: The undesignated reserve funds are approximately three times the annual operating revenues.
Página 21
F2: Stumpy Meadows Reservoir is the only source of water for GDPUD.
Página 21
F3: The district operates with no written personnel procedures or formal policies for employees and their evaluations.
Página 21
F4: The District has two CPAs. One is an employee, and the other is an hourly consultant.
Página 21
F5: GDPUD uses an accounting software program called Multiple Operations Manager (M.O.M.), while the Consultant uses Solomon.
Página 21
Recomendaciones adicionales 6

No vinculadas a hallazgos específicos.

R1: GDPUD should adopt and publicize their policy for accumulating undesignated reserve funds as well as the planned use of the funds.
Página 21
R2: GDPUD should look into secondary water sources for the anticipated growth within the District.
Página 21
R3: GDPUD should create a personnel policies and procedures manual. The manual should be updated periodically as required.
Página 21
R4: There should only be one CPA. The time frame of the contract with the Consultant should be reduced and a termination date established.
Página 21
R5: For efficiency purposes, there should be one accounting software program. 2
Página 21
R6: GDPUD should increase treated water storage capacities in the event of equipment breakdown or extended drought cycles. Commendation Management is very proactive in seeking to meet the needs of its customers and appears interested in the overall well being of the community. Responses Required for Findings
Página 22
Hallazgos & Recomendaciones 5 hallazgos
F1: The Consultant performed audits for GDPUD from 1981 through 1995 in addition to certain accounting functions with GDPUD management knowledge and approval.
Página 24
F2: Generally Accepted Accounting Principles (GAAP) and Generally Accepted Auditing Standards (GAAS) do not allow a self-audit. Government Auditing Standards (Yellow 5 Book) do allow self-audits under certain conditions. The Yellow Book was revised in January 2003 to disallow a self-audit and any appearance of same.
Página 24
F3: It appears no Management Representation Letter was presented to the auditor for the fiscal year ending June 30, 2000.
Página 25
F4: The General Manager signed a Management Representation Letter for the fiscal year ending June 30, 2002 covering a period of time prior to his employment.
Página 25
F5: The Consultant did not have a written contract for accounting services until 2001. There were Letters of Engagement only for the auditing functions signed by the General Manager.
Página 25
Recomendaciones adicionales 4

No vinculadas a hallazgos específicos.

R1: An independent audit firm should conduct the annual audit.
Página 25
R2: Proper letters of engagement and management representation should be prepared for the audit.
Página 25
R3: Board Members and the General Manager should not allow a self-audit or the appearance of a self-audit.
Página 25
R4: GDPUD should enter into contracting services with a clear statement and understanding by all parties of work to be done. Responses Required for Findings
Página 25
Hallazgos & Recomendaciones 1 hallazgos
F1: A solution to the code non-compliance of the kitchen hood has been agreed upon by the State Fire Marshall, Department of Forestry and Department of Corrections. Response to Finding
Página 65
Hallazgos & Recomendaciones 6 hallazgos
F1: The Sheriff told the Undersheriff he could be assigned to Lake Tahoe, with the hours and days to be set by the Sheriff.
Página 33
F2: The Sheriff did not set days or hours for the Undersheriff to work in South Lake Tahoe.
Página 33
F3: The Undersheriff received Tahoe Differential pay without working primarily in the South Lake Tahoe area.
Página 33
F4: Payroll clerks, without written authorization, routinely sign Payroll/Personnel Action forms on behalf of Division Chiefs, including those resulting in financial impact.
Página 33
F5: The Tahoe Differential pay received by the Undersheriff impacted his final compensation, which in turn was used to calculate his retirement benefits.
Página 33
F6: The Grand Jury investigation revealed this was an isolated case.
Página 33
Recomendaciones adicionales 4

No vinculadas a hallazgos específicos.

R1: Payroll/Personnel Action Forms relating to the Undersheriff should be signed by the Sheriff.
Página 33
R2: Delegation of authority to Payroll Clerks to sign on behalf of Division Chiefs should be specific and exclude actions involving financial benefit.
Página 33
R3: The County should be reimbursed for the Tahoe Differential paid to the Undersheriff. 14
Página 33
R4: The County Counsel should review with the Board of Supervisors the issues presented and take whatever action(s) is deemed appropriate.
Página 34
Hallazgos & Recomendaciones 2 hallazgos
F1: The school owns an acre of land that is not being utilized due to funding.
Página 73
F2: The elevator for disabled is not in working condition.
Página 73
Recomendaciones adicionales 1

No vinculadas a hallazgos específicos.

R1: The elevator should be repaired.
Página 73
Hallazgos & Recomendaciones 4 hallazgos
F1: With the addition of the County Wide-Area Network (WAN), there is no current billing methodology to accurately capture the costs of mainframe-based CPU minutes, and properly allocate these charges to those accessing the data.
Página 129
F2: Departments are only billed for Central Processing Unit (CPU) minutes when accessing the mainframe for data, and are not charged for hard-drive storage, or for requests of printed reports.
Página 129
F3: It appears departments are emphasizing the usage of Web browsers to access the mainframe over the cost applied billing methodology that easily identifies the user. This results in less identifiable mainframe CPU minutes through the 3270 Emulation Sessions, and more CPU minutes through the unidentifiable user-based web browser, WAN.
Página 129
F4: Public access to the mainframe accrues CPU minutes that are indistinguishable from departmental inquiries using WAN. Since these charges are allocated to departments in accordance with mainframe cost applied charges (Policy B-8), the current billing methodology discourages departments from posting and uploading information for the Public to access.
Página 129
Recomendaciones adicionales 3

No vinculadas a hallazgos específicos.

R1: The Board of Supervisors should create new Policies and Procedures that provide for a workable billing methodology for the “County Wide-Area Network” (WAN), and should amend Policy and Procedure B-8 to include charges for measurable uses of resources from Information Services (IS).
Página 129
R2: New County Policy and Procedures should establish methodologies that account for all the costs associated with WAN, or network related charges, and properly allocate these costs to the users of the system. The Board of Supervisors should work with IS to come up with a solution for this accountability problem. 110
Página 129
R3: County Policy and Procedures B-8 should be amended to allow for the collection of revenues by IS, for measurable uses of resources, such as print copy, and the utilization of mainframe hard drive space by certain departments. The Board of Supervisors should work with IS to resolve this accountability problem. Responses Required for Findings
Página 130
Hallazgos & Recomendaciones 11 hallazgos
F1: Some departments encourage employees to cross-train into the field of Information Technology (IT) to avoid the costs associated with the Information Services (IS) department’s programming, training, and PC support services.
Página 132
F2: IT functions are handled independently by departments, so the total cost to the County for IT equipment and staff are unknown.
Página 132
F3: Since budgets of departments vary, some departments are able to keep current with technology, while others are incapable of upgrading. 113
Página 132
F4: In some cases, IS cannot produce or replicate industry specific software and the related service and support, so that departments must utilize outside vendors.
Página 133
F5: There are no industry-specific requirements found within County departments, which might justify the wide array of email programs in use.
Página 133
F6: The Board of Supervisors (BOS), Chief Administrative Officer (CAO), IS, and other departments have no venue to which they may refer purchases of multi-department or new systems development projects exceeding $10,000.
Página 133
F7: The Information Technology Steering Committee (ITSC) is controlled and directed by its members. These members are countywide Departmental Directors, and must abide by County Policies and Procedures A-10 (2) (b) when submitting approval requests for purchases of multi-departmental and new systems development projects exceeding $10,000. By not attending the ITSC meetings, Departmental Directors invalidate the ITSC, and are thus incapable of enforcing decisions by the ITSC on themselves.
Página 133
F8: In January 2001 and again in 2003, the BOS and the District Attorney’s Office (DA) together signed both the DAMION Software License and Maintenance Agreement contracts without the endorsement of IS through the ITSC.
Página 133
F9: The DAMION contract was signed in 2001 by the BOS and the DA with full knowledge of a potential security breach for the County.
Página 133
F10: The DA signed the contract for the DAMION Software License and Maintenance Agreement, and scheduled its submission to the BOS before giving it to IS for their approval.
Página 133
F11: IS was given insufficient time (6 hrs) to review the DAMION Contract.
Página 133
Recomendaciones adicionales 7

No vinculadas a hallazgos específicos.

R1: Since IS is in a position to provide the County with improved promotional decisions of IT workers, and provide ongoing testing and training of current technologies, departmental IT staff throughout the County should be trained and under the jurisdiction of the IS.
Página 133
R2: Since the County stands to benefit from bulk purchasing, the technology budget should be consolidated and shifted to IS.
Página 133
R3: In the event that the utilization of an outside vendor is required, IS should review hardware, software, and IT-related contracts before the departments go forward with purchases.
Página 133
R4: IS should establish a countywide standard for both Internet and intranet email applications, along with standards for database and operating systems. 114
Página 133
R5: The Board of Supervisors should vote to amend Policy A-10 by either dissolving the Information Technology Steering Committee (ITSC) or include language to enforce its duties.
Página 134
R6: The District Attorney’s Office and the Board of Supervisors should work with IS to ensure the DAMION system is equipped with the proper security tools for protecting the County’s IT data.
Página 134
R7: The Board of Supervisors should take seriously the recommendations made by IS as they relate to contracts or purchasing decisions, and ensure that departments allow IS reasonable time for this review process.
Página 134
Hallazgos & Recomendaciones 4 hallazgos
F1: The Library carpet is old, rippling, and disintegrating, thus posing a safety hazard to users and a potential liability to the County. 141
Página 160
F2: The Print Shop exit sign is not illuminated.
Página 161
F3: The Print Shop fire extinguisher is partially blocked.
Página 161
F4: The wall in the southwest corner of the Archival Record Storage area shows evidence of prior water leakage.
Página 161
Recomendaciones adicionales 4

No vinculadas a hallazgos específicos.

R1: The carpet should be replaced.
Página 161
R2: The exit sign should be repaired.
Página 161
R3: The print shop fire extinguisher should be unblocked for easier emergency use.
Página 161
R4: The possible leakage in the southwest corner of the Archival Record Storage Area should be monitored. Responses Required for Findings
Página 161
Hallazgos & Recomendaciones 5 hallazgos
F1: Investigations were conducted by both the Placerville Police Department and the El Dorado County Sheriff’s Department into the activities of Women Helping Women in El Dorado County.
Página 52
F2: The Placerville Police Department and El Dorado County Sheriff’s Department investigative reports were forwarded to the District Attorney.
Página 52
F3: On February 13, 2002 meeting with five members of Women Helping Women, the District Attorney advised the women no action would be taken if they stopped all group activities in El Dorado County as of that date.
Página 52
F4: The alleged head of El Dorado County Women Helping Women was one of the five women who met with the District Attorney and was told no charges would be brought against her if she stopped all her activities in El Dorado County as of that date. 33
Página 52
F5: The District Attorney has not taken any action against any members of Women Helping Women in El Dorado County. Responses Required to Findings
Página 53
Hallazgos & Recomendaciones 8 hallazgos
F1: The Science Laboratory Building is the only permanent building built in the last 18 years. All other additions have been modular classrooms.
Página 80
F2: Locker space is not available for all students.
Página 80
F3: Parking is a problem. Students park on the congested two-lane road in front of the school as well as adjacent roads. As the student population continues to grow, this problem will increase dramatically.
Página 80
F4: The limited vehicle entrances for students, buses, and visitors create unsafe and hazardous conditions on these roads.
Página 80
F5: There is only one School Zone warning sign located near a blind curve on the south side of the campus.
Página 80
F6: There is inadequate space to pick-up or drop-off students so students are frequently dropped off on the main roadway.
Página 80
F7: There are no streetlights in front of the school on Ponderosa Road. This causes unsafe conditions for students and parents that attend evening after-school activities and for students arriving during early morning hours, especially in the winter months.
Página 80
F8: The restrooms are not always clean and are not well stocked with supplies. 61
Página 80
Recomendaciones adicionales 7

No vinculadas a hallazgos específicos.

R1: Additional student locker space should be provided.
Página 81
R2: The current student parking needs should be evaluated.
Página 81
R3: An additional entrance on the south side of the lot should be considered and this entrance should have a three-way stop sign or traffic actuated stoplight.
Página 81
R4: Additional School Zone warning signs should be installed on Meder Road and the north side of the campus on Ponderosa Road.
Página 81
R5: A turnout area should be added off Ponderosa Road for drivers to pick-up and drop-off students.
Página 81
R6: Streetlights should be installed in front of the campus on Ponderosa Road.
Página 81
R7: Restrooms should be inspected for cleanliness and supplies by daytime maintenance staff each morning, especially in Building P.
Página 81
Hallazgos & Recomendaciones 8 hallazgos
F1: The building exterior paint is peeling.
Página 163
F2: The parking lot surfaces are severely checked and cracked. The parking lot surface poses a danger to users and potential liability to the County.
Página 163
F3: The parking lot directional markings go against the parking lot traffic flow and are severely faded.
Página 163
F4: The parking lot is inadequate and limits the full use of the facility.
Página 163
F5: The laundry room is dirty and cluttered.
Página 163
F6: The support column in the observation area has sharp edges/corners.
Página 163
F7: The surveillance system for the lock up rooms for the observation area is inadequate.
Página 163
F8: The water fountain in hall outside the activity room is inoperative.
Página 163
Recomendaciones adicionales 8

No vinculadas a hallazgos específicos.

R1: The building exterior should be painted.
Página 163
R2: The parking lot should be repaired and resurfaced.
Página 163
R3: Directional arrows should show proper traffic flow.
Página 163
R4: The support column in the observation area should be padded.
Página 163
R5: A rubber table should be provided in the observation area.
Página 163
R6: Surveillance system should be replaced with an updated version to cover the entire area of each lock up room.
Página 163
R7: The water fountain should be repaired.
Página 163
R8: The laundry room should be cleaned and maintained on a regular basis. Responses Required for Findings
Página 163
Hallazgos & Recomendaciones 3 hallazgos
F1: The parking lot surface is severely checked and cracked. The parking lot surface poses a hazard to users and is a potential liability to the county.
Página 153
F2: The parking lot directional markings contradict the parking lot traffic flow and are severely faded.
Página 153
F3: Some hallways are cluttered. 134
Página 153
Recomendaciones adicionales 3

No vinculadas a hallazgos específicos.

R1: The parking lot should be repaired and resurfaced.
Página 154
R2: Directional arrows should show proper traffic flow.
Página 154
R3: All clutter should be removed from hallways when renovation is finished. Responses Required for Findings
Página 154
Hallazgos & Recomendaciones 5 hallazgos
F1: Of the nine County employees tested during 2000/01 and 2001/02, five were found unfit for duty.
Página 88
F2: Employees must travel to the doctor’s office in Sacramento, including employees who reside and work in South Lake Tahoe.
Página 88
F3: Some departments do not consistently follow purchase order and contract procedures and policies set forth by the Board of Supervisors.
Página 88
F4: Department Directors are not held accountable for following policies and procedures related to purchase orders and contracts by the CAO and the Board of Supervisors.
Página 88
F5: The County did not appropriately contract for the doctor’s services directly and therefore the County was probably not protected from liability and potential litigation.
Página 88
Recomendaciones adicionales 5

No vinculadas a hallazgos específicos.

R1: The Board of Supervisors, with the assistance of the County Counsel and the Manager of Procurement and Contracts’ Office, should establish and enforce a procedure for departments to meet legal specifications and to be in compliance with procedures in awarding contracts for services.
Página 88
R2: The Board of Supervisors and the CAO should hold all County departments accountable for the policies and procedures established by the Manager of Procurement and Contracts’ Office.
Página 88
R3: The Department of General Services and the Procurement and Contracts’ Office personnel should design and provide a series of training programs on purchase orders and contract procedures for County staff.
Página 88
R4: Department Directors should be evaluated on their adherence to County procedures and their attendance at required training sessions. 69
Página 88
R5: Confirming purchase orders (after the fact purchases) should not be acceptable. A memo signed by the Department Director explaining the nature of the “confirming” requisition should accompany all confirming purchase orders. The CAO should be required to approve retroactive purchases not authorized by the Purchasing Agent.
Página 89
Hallazgos & Recomendaciones 4 hallazgos
F1: The building exterior paint is peeling.
Página 166
F2: The parking lot surface is severely checked and cracked, and poses a potential danger to users and potential liability to the county.
Página 166
F3: The parking lot directional markings contradict the parking lot traffic flow and are severely faded.
Página 166
F4: The parking lot size is inadequate and limits the full use of the facility.
Página 166
Recomendaciones adicionales 3

No vinculadas a hallazgos específicos.

R1: The building exterior should be painted.
Página 166
R2: The parking lot should be repaired and resurfaced.
Página 166
R3: Directional arrows should show proper traffic flow.
Página 166
Hallazgos & Recomendaciones 10 hallazgos
F1: It appears the former Sheriff promoted a Captain to Undersheriff for personal reasons, rather than for the benefit of the County.
Página 37
F2: The Sheriff authorized the Undersheriff to use accumulated leave from January 31, 2000 through April 28, 2000.
Página 37
F3: The Undersheriff contacted the Payroll clerks with instructions to change his vacation leave to sick leave.
Página 37
F4: The 2000/2001Grand Jury reported this Undersheriff was paid 200 hours for sick leave when he was not sick and resulted in the use of accumulated sick leave for which he would not have been entitled to be paid for upon retirement.
Página 37
F5: The Sheriff, responding to the 2000/2001 Grand Jury Report, said he would investigate the Grand Jury’s finding. If the Sheriff determined that the Undersheriff was not entitled to receive sick leave payment, he would demand repayment of funds.
Página 37
F6: The Sheriff alleges he sent a letter to the Undersheriff on August 29, 2001, requesting doctor’s documentation. However he failed to follow up on said letter for a period of fourteen months until contacted by this Grand Jury.
Página 37
F7: The Undersheriff responded in a letter on October 9, 2002 that he was sick during the time in question.
Página 37
F8: The Undersheriff’s medical records reviewed by this Grand Jury do not appear to substantiate his claim.
Página 37
F9: A review by this Grand Jury of Sheriff’s Department sick leave records, between January 1999 and November 2002, revealed this apparent abuse of sick leave to be an isolated case.
Página 37
F10: In January 2003, the County Counsel filed suit against the Undersheriff in small claims court to recover monies owed pursuant to the limitations of said court.
Página 37
Recomendaciones adicionales 4

No vinculadas a hallazgos específicos.

R1: Procedures should be established, implemented, and followed for obtaining appropriate approval to change any vacation leave to sick leave for all personnel, including management.
Página 37
R2: Written medical verification required for related sick leave should be obtained in a timely manner. 18
Página 37
R3: Proper procedures should be established for follow-up of required written medical verification.
Página 38
R4: County Counsel should review the issues presented and take whatever additional action they deem appropriate.
Página 38
Hallazgos & Recomendaciones 4 hallazgos
F1: Neither SLT nor the TRPA are enforcing the prohibition of transit lodging in Tahoe Keys (area 102).
Página 141
F2: SLT is collecting Transit Occupancy Tax on the vacation rental homes in the Tahoe Keys (area 102).
Página 141
F3: SLT has passed further ordinances to regulate, but not ban the use of homes that are used as vacation rentals. These ordinances include the Tahoe Keys (area 102).
Página 141
F4: In apparent contradiction to TRPA and SLT ordinances houses continue to be rented and taxes continue to be collected.
Página 141
Recomendaciones adicionales 2

No vinculadas a hallazgos específicos.

R1: SLT should negotiate with TRPA either to change the prohibition against transit lodging in the Tahoe Keys or enforce the existing law.
Página 141
R2: The SLT ordinance should be rewritten to be consistent with TRPA regarding transit lodging in the Tahoe Keys (area 102). Responses Required for Findings
Página 141
Hallazgos & Recomendaciones 4 hallazgos
F1: The non-physical Exhibit Room appears to lack adequate space and shelving. Exhibits appear to be in disorder and are placed on the floor in this small room.
Página 29
F2: Written procedures are not being followed for discarding closed-case exhibits. About 75% of exhibits in the storage area are beyond the retention period. 10
Página 29
F3: There is no person designated to manage the exhibit process.
Página 30
F4: No sprinkler system or fire extinguishers could be found in or near the Exhibit Room.
Página 30
Recomendaciones adicionales 4

No vinculadas a hallazgos específicos.

R1: The Exhibit Room should have adequate shelving.
Página 30
R2: All exhibits should be inventoried and established procedures should be followed.
Página 30
R3: A person should be designated to manage the exhibit process.
Página 30
R4: A fire extinguisher should be installed in or near the Exhibit Room. Responses Required for Findings
Página 30
Hallazgos & Recomendaciones 4 hallazgos
F1: The Building is not conveniently located to the County Government Center.
Página 156
F2: The Building needs major renovations to be usable for County purposes.
Página 156
F3: Seventy-five percent of The Building has not been used since the purchase in May 2000.
Página 156
F4: In November 2001 the Board of Supervisors approved use of The Building for Superior Court Family Law; however, no actual plans have been implemented. 137
Página 156
Recomendaciones adicionales 1

No vinculadas a hallazgos específicos.

R1: In light of the countywide office space need, the Board of Supervisors should reconsider their options and move forward expeditiously. Responses required for Findings
Página 157