Ventura County Grand Jury • 1996-1997

Ventura County Department of Weights & Measures

3 pages
Ver PDF original

Note: Missing finding numbers detected: F2, F4

Findings 3 findings

F1
During the tour of the El Rio Facility, the Grand Jury members observed wet floors ln the watt-hour meter testing laboratory due to a leaklng roof, and very crowded - conditions of the facility overall. This lab testse lectrical meters by applying 240 - VDC at 30 Amps during the tests, thereby creating very unsafe and hazardous conditions for the inspector perfonnlng the tests.T he El Rlo Facility is leased by the department from Ventura County General Services Agency (GSA). I. Working standards used in the field to test and certify weighing and measuring devices are not labeled or marked, and have no records attached to indicate the device’s certification due date. Certificates of Accuracy issued by DMS are on file in the county’s Department of Weights and Measures office. These records are not visible to the inspector using the standard, therefore the inspector is not aware of the due date. The potential of using a standard beyond its due date is a possibility.
F3
The field inspectors appear to be well trained and diligently perform their -. duties. They were very courteous and displayed a cooperative attitude with the employees of the businesses they inspected. .-
F5
Over the years, the Department of Weights and Measures has experienced a staff reduction from approximately eleven inspectors to the current level of five. Consequently, this reduction has impacted the ability of the department -, to adequately cover the inspection areas. -.

Recommendations 3