Ventura County Grand Jury • 1995-1996

Addendum to Santa Paula Pssa Office Reports

Published: November 20, 1995 5 pages
View Original PDF

Findings 27 findings

F1
The building that houses the Santa Paula office is 46 years old. There have been no major renovations. The agency has occupied the space for 14 years. The number of staff and clients has increased, but the available space has not expanded.
F2
There are nine interview rooms for approximately 100 clients. The result is that there are many people waiting in the small waiting room for long periods of time. This could lead to frustration and possibly violence.
F3
The small interview rooms are located in a separate section of the building and do not have telephones or an inter-communication system. Two of the nine rooms are so far away that a shout for help could not be heard by the staff.
F4
There is no security guard inside nor in the parking lot.
F5
There is no available space for staff meetings. Training meetings are mandatory and approximately 35 employees are expected to attend regular meetings. When these meetings occur, the aisle is blocked with chairs, creating an evacuation hazard.
F6
Files are stored in paper file boxes stacked on the floor in the staff area. The boxes sit next to the desks and the aisles, which would hinder evacuation. Files are also stored on open shelves in the staff area. This creates a fire hazard as well as the danger of falling on someone during an earthquake.
F7
There is no efficient evacuation route in case of a bomb threat or violent intruder.
F8
There are no overhead sprinklers nor smoke/fire detector alarms.
F9
There are at least 150 people present at any one time in the building. This includes staff and clients. Many of the clients bring their children with them to the office.
F10
The large plate glass windows in the waiting room and in two of the interview rooms are not shatter-proof glass. One window has a crack running halfway across it. The front door is plate glass which is not shatter-proof.
F11
The sidewalk in front of the building is broken and uneven in places.
F12
There are cracks, bumps and a large "pot hole" in the parking lot.
F13
The roof guttering and down spout on the front of the building direct the rainwater onto the public telephone and the front door.
F14
A tour of the building and meetings between County officials and the Santa Paula City Manager took place in November, 1995 and February, 1996. A Memorandum of that meeting (Nov. 20, 1995) stated that, due to the lack of existing rental space in Santa Paula, the County should consider three methods of constructing a new building: (1) Purchasing land and building an adequate office, (2) Leasing a newly constructed building from Santa Paula Redevelopment or (3) Leasing or buying a new building from a private developer. PROGRESS TO DATE AND COMMENDATIONS
F15
Security measures are being upgraded in the form of bullet-proof "barrier glass" enclosing the information counter in the waiting room. This was completed in February.
F16
Digital locks: In February, digital, push-button locks were installed on the front door and the door leading from the waiting room to the staff area.
F17
Disaster supplies: A large trunk contains supplies such as blankets, flashlights and first aid supplies for use in case of an earthquake or other disaster. Employees may purchase a small, individual kit for a nominal fee. These are kept at the employees' desk or in their cars.
F18
Disaster training: Classes have been offered to employees for the past two years. These include instruction in first aid & procedures for safety during a disaster. There is a wide variety of classes and they are well attended.
F19
PSSA has agreed to purchase drinking water as part of the Earthquake Kit.
F20
The two large interview rooms which had been closed off for two years, are now in use. In March, the asbestos was removed, the ceiling was replaced and the walls were painted. The adjoining hallway walls were also repainted.
F21
The County Chief Administrative Officer and the Program Management Analyst conducted a walk-through inspection on November 9, 1995. A "Safety Inspection List " of 41 deficiencies was compiled. As of March 24, 1996, 24 have been remedied. Many minor problems were taken care of in January, 1996, by the General Services Agency (GSA).
F22
The above named officials have provided the Grand Jury with this list and also memos with an update of repairs made and work to be done.
F23
The Santa Paula Fire Department made an inspection on February 27, 1996 and found two minor violations. It will be asked to calculate the " maximum occupancy load " for the building in order to assure safety.
F24
The new, month to month, lease will state that, if the landlord does not carry out his responsibilities for repairs, the County will have the repairs made and deduct the cost from the rent.
F25
According to the new lease, the County will assume responsibility for maintenance and custodial service. A written policy will be developed that defines the responsibility of both the General Services Agency (GSA) and PSSA.
F26
The County is currently working with a real estate agent to locate possible rental buildings or building sites in Santa Paula. Six sites are designated for further investigation. If these efforts fail, the County should locate sites for construction in Santa Paula and the surrounding areas.
F27
PSSA has agreed to consider revising some operational procedures in order to alleviate the crowded condition. These include: Expanding client hours, instituting a 5 day week, utilizing another office, providing a cost estimate for modular partitions and furniture and also for hiring a person to facilitate the movement of files to and from a storage area. 68