📋
Extraído del Informe Consolidado

Esta investigación fue publicada originalmente como parte de un informe consolidado más amplio que contiene múltiples investigaciones. Consulte el PDF consolidado para ver el documento completo.

Los Angeles County Grand Jury • 2017-2018

11. Continuity Committee

60 pages
View PDF View Full Original

Findings and Recommendations 3 findings

F1 Page 229
Los Angeles County Public Works • Los Angeles County, annual forecast budget is $80 -100 million • Slurry and concrete repair work are performed every 3 years • Asphalt surfaces at bus stops are being replaced with concrete surfaces • Sinkholes are filled every 1-2 years • Street resurfacing is rarely done • A generic telephone number is utilized for each jurisdiction to report potholes15
No recommendations for this finding
F2 Page 229
Long Beach Public Works • The Port of Long Beach is responsible for road maintenance in their area • Public Works is responsible for preparation and maintenance for special events, such as the Long Beach Grand Prix • The City of Long Beach utilizes a smart phone application to take a picture of potholes, which sends the picture to the Public Works Department16
No recommendations for this finding
F3 Page 229
Los Angeles City Street Department • The Department operates on annual budget of $140–153 million • Utilizes hydraulic pressure or pressurized water to prepare the hole before the pothole is repaired • Inspects the city streets every 3 years • Repairs and maintains all airport streets • Offers an online basic assessment of pavement conditions around the city 15 Interview with a high level manager from Los Angeles County Department of Public Works, January 9, 2018 16 Interview with a high level manager from Long Beach City Department of Public Works, Public Service Bureau, January 12, 2018 210 2017-2018 LOS ANGELES COUNTY CIVIL GRAND JURY FINAL REPORT
No recommendations for this finding