Lake County Grand Jury
• 2023-2024
Pacific Gas and Electric Undergrounding in Lake County
⚠️ Translation Notice: This content has been automatically translated. The original English text is the official version. Translation may contain errors.
⚠️ Este contenido ha sido traducido automáticamente. El texto original en inglés es la versión oficial. La traducción puede contener errores.
Findings 5 findings
F1
Page 50
PG&E did not follow the guidelines set forth in the CATTCH handbook to which PG&E is a signatory. DPW stated explicitly in writing, that PG&E was to follow CATTCH
F2
Page 50
PG&E did not notify emergency services when it closed off access to the Golf Road area in Cobb.
F3
Page 50
PG&E did not notify the Golf Road area residents that the access to individual roads would be closed, with no alternative routes set out. 51
F4
Page 51
There was insufficient oversight by Lake County DPW, due to simultaneous projects by PG&E running county wide.
F5
Page 51
The distance between several PG&E crews working simultaneously stretches DPW inspection resources.
Recommendations 4
-
R1Page 51That DPW explore funding additional inspectors, at the expense of PG&E. F4, F5
-
R2Page 51That DPW contract with a licensed engineering firm to perform inspections of PG&E, and their subcontractors, during heavy inspection times. F4, F5
-
R3Page 51That DPW enforce the CATTCH guidelines, per their encroachment permits. F1
-
R4Page 51That DPW ensure that PG&E make all required emergency service and residential notifications in a timely manner. F2, F3 RESPONSE As per the California Penal Code, Section 933.05(a), (b), (c), the following responses are required: Lake County Department of Public Works (DPW) R1, R2, R3, R4 90 days