Findings 4 findings

F1 Page 9
The boring samples were not taken from the area of the excavation where the sewer line was to be installed.
F2 Page 9
Performance of additional boring along the relocated pipeline and utilization of Dig Alert in the early stages of the project would have identified the concrete highway beneath the asphalt and the additional utility crossovers. Incorporation of this information into the initial bid documents would have eliminated the necessity of returning to the Board of Supervisors for the excessive overrun cost of the allocated budget.
F3 Page 9
Accurate drawings were not available identifying crossover utilities.
F4 Page 16