📋
Extracted from Consolidated Report
This investigation was originally published as part of a larger consolidated report containing multiple investigations. View the consolidated PDF for the complete document.
⚠️ Translation Notice: This content has been automatically translated. The original English text is the official version. Translation may contain errors.
⚠️ Este contenido ha sido traducido automáticamente. El texto original en inglés es la versión oficial. La traducción puede contener errores.
Findings 1 findings
F1
Page 26
Entrance to the facility crosses over a substantial railroad berm 4 that can cause a vehicle to become high-centered 5 or damaged. RECOMMENDATIONS
Recommendations 1
-
R1Page 26A more gradual incline should be made to ease access over the track. A work order should be filed with the county of receipt of this report. Berm: A mound or wall of earth or sand. High-centered: A vehicle that is stranded with all or most of it’s wheels off the ground. REQUIRED RESPONSES Pursuant to Penal Code sections 933 and 933.05, the following response is required from the following governing body ● Yuba County Sheriff INVITED RESPONSES The Grand Jury invites the following to respond ● The Yuba County Board of Supervisors 18 This page intentionally blank 19 20