F1
We found no goals in the MUD Business Plan regarding the reduction and upgrade of the fleet. Deputy Director Gittings was not aware of a plan to do this and after researching this further informed us that he talked to the managers of MUD and none had any recollection of a fleet upgrade program. He also spoke with the former Deputy Director of Wastewater, Robert Simmons, who stated that he was not aware of such a program and that no such plans were included in the Business Plan, which he was very involved in developing. We found that the Wastewater Division has 2 boom trucks, one 2�-ton utility truck, and 19 small to medium sized (� to �-ton) pickup trucks. The smaller trucks have utility beds for carrying tools, including equipment for repairing pumps and motors. One truck has been fitted with a hydraulic valve turner, which is used to open and close heavy valves. The present climate of impending privatization makes it unlikely that any major changes to the Wastewater Division's existing vehicle fleet will occur for now. Any such changes would need to be coordinated through the City Corporation Yard and would require approval of the Director of Stockton MUD. Regarding alleged failure to follow City Manager's directive for take-home vehicles: The complaint alleges blatant disregard of the City Manager's policy for take-home vehicles, allowing two vehicles to be taken home without the authorization of the City Manager.
No recommendations for this finding
F2
We found that the City has a detailed policy on take-home of City vehicles, set forth in City Manger Administrative Directive No. MAN-16 dated 03/01/2002, which was revised from a 12/22/1992 policy. This policy authorizes a total of 11 take-home vehicles for the entire Stockton Municipal Utilities Department, all for employees who are required to immediately respond to emergency situations on a 24-hour basis. Only 2 of these are authorized to the Wastewater Division: one for the Plant Maintenance Supervisor, one for the Senior Electrician. Directive MAN-16 requires that an annual take-home vehicle report be submitted by department heads in January for City Manager approval. We requested and reviewed such reports for 12 employees. This is one more than the 11 authorized by the policy, the extra being a take-home vehicle for a second Senior Collection System Operator in the Collection Systems Division, where the directive indicates one is authorized. In April of 2001, Mr. Gittings made written request of Stockton MUD Director, Mr. Morris Allen, for permission to assign one additional vehicle to two mechanics on a six-month rotation to ensure that at least one additional maintenance employee would have a vehicle at all times to respond to after-hours emergency situations. This request was made and approved under provisions of Directive MAN-16. We were unable to identify any Wastewater Division vehicles that are being taken home without the authorization of the City Manager. Regarding alleged non-licensed, non-certified employees performing high voltage electrical design, installation, and maintenance: The complaint alleges that the staff is not qualified to work on voltages above 480V, that is 60KVA, 12.5KVA, and 4160KVA. There is no certified safety equipment to perform work on voltages over 480V; however, the Deputy Director and Plant Maintenance Supervisor have allowed staff to work on the higher voltage system without proper training or safety equipment.
No recommendations for this finding
F3
The 2002-2003 SJCCGJ recommends that the Stockton MUD Wastewater Department develop and implement procedures to maintain a Master Lockout/Tagout Log, where the lockout/tagout records of the various maintenance logs can be consolidated for more effective monitoring. RESPONSE REQUIRED: Pursuant to Section §933.05 of the Penal Code: The Wastewater Division of Stockton Municipal Utilities Department shall report to the Presiding Judge of the San Joaquin Superior Court, in writing and within 90 days of publication of this report, with a response as follows: As to each finding in the report a response indicating one of the following: a. The respondent agrees with the finding. b. The respondent disagrees with the finding, with an explanation of the reasons therefore. As to each recommendation, a response indicating one of the following: a. The recommendation has been implemented, with a summary of the action taken. b. The recommendation has not yet been implemented, but will be with a time frame for implementation. c. The recommendation requires further analysis, with an explanation of the scope of the analysis and a time frame not to exceed (6) six months. d. The recommendation will not be implemented, with an explanation therefore. EXHIBIT 1001 - A LIST OF MATERIALS REQUESTED AND RECEIVED FROM STOCKTON MUD WASTEWATER DIVISION
No recommendations for this finding
F3a
We reviewed the Departments' job descriptions and requirements and found no requirements for certification for maintenance crew electrical workers. There are statements to the effect that employee participation in the CWEA (California Water Environment Association) voluntary certification program is desirable, but not mandatory. There are requirements in the job descriptions for training and experience for these workers. We also reviewed the California Code of Regulations (CCR), Title 8. Industrial Relations, including sections on general industry safety orders, high voltage electrical safety orders, and training standards and found no requirement for certification. There are standards for training set forth in these regulations. We requested and reviewed the Department's training records for employees who do the high voltage work for the Department. Two individuals were identified to us as those who do such work, and the recorded training courses were numerous. As an example, one individual has the following training record: Basic industrial electricity course (sixteen-hour course) PG&E electrical/gas line safety course Cogeneration facilities courses (9 courses) - high voltage training Electrical safety class (sixteen-hour course) We were informed by Mr. Gittings that safety equipment is provided to the electrical workers, including rubber mats and gloves and any safety equipment they may need. We were also informed that the Department's procedures for high voltage work requires that the system being worked on be taken down (deactivated and disconnected from electricity) prior to work commencing, and that lockout and tagout procedures are used to preclude accidental reactivation while work is in progress. We did not believe that further confirmation of these procedures through additional interviews was warranted for our investigation. The complaint also alleges that Wastewater Division staff is allowed to perform design work that the City of Stockton will not accept from others without a licensed Electrical Engineer stamp, creating the potential for overloading the electrical system, damage to equipment, and hazards to employee safety.
No recommendations for this finding
F3b
Ms. Nancy Eissler of the Enforcement Unit of the Professional Engineers Board, California Department of Consumer Affairs, was contacted by a member of the Grand Jury, and was asked to clarify how §6747 of the Professional Engineers Act, Business and Professions code applies to public utilities such as Stockton MUD. She indicated that all public utilities are exempted by this code section from the requirement that only licensed engineers perform electrical and mechanical design work related to the systems of such public utilities. The full text of this code section is shown below: §6747. Exemption for industries a. This chapter, except for those provisions that apply to civil engineers and civil engineering, shall not apply to the performance of engineering work by a manufacturing, mining, public utility, research and development, or other industrial corporation, or by employees of that corporation, provided that work is in connection with, or incidental to, the products, systems, or services of that corporation or its affiliates. b. For purposes of this section, "employees" also includes consultants, temporary employees, contract employees, and those persons hired pursuant to third-party contracts. Therefore we found that, for electrical and mechanical design work related to its own systems, Stockton MUD is not required to have the design work performed and stamped by a licensed Electrical Engineer. Regarding alleged non-certified welders performing welding on pressure pipe and structural steel that require certification: The complaint alleges that contrary to CAL OSHA requirements for certified welding, in house non-certified employees are allowed to perform structural welding on dissolved air flotation (DAF) tanks and pressure pipes, placing equipment and employees in harms way.
No recommendations for this finding
F4
We reviewed the Departments' job descriptions and requirements and found no requirements for certification for maintenance crew welding workers. There are requirements in the job descriptions for training and experience for these workers. We also reviewed the California Code of Regulations (CCR), Title 8. Industrial Relations, and again found no requirement for certification. There are standards for training set forth in these regulations. We requested and reviewed the Department's training records for employees who do the welding work for the Department. Three individuals were identified to us as those who do such work, and each has one or two recorded training courses in welding. We were informed by Mr. Gittings that welding on pressure vessels does require specialized training, but that the Department does not permit its employees to do this kind of work. Instead, pressure vessel welding work is contracted out to a private company with personnel trained to do such work. Regarding alleged failure to monitor contractors to ensure work is being performed: The complaint alleges the failure to monitor landscaping contractors resulting in payment for services not rendered. An additional allegation is that a particular painting contractor received contracts for work without undergoing required bidding procedures.
No recommendations for this finding
F5
Date Completed We requested the Department's Lockout/Tagout Log and were provided with three different kinds of logs that contained entries that recorded lockout/tagout events interspersed among other maintenance events. No master lockout/tagout log was provided. We found that none of the logs included all of the information items required for the Lockout/Tagout Log by directive SAF-18. Missing in all of these logs was the Lock #, and in some instances the Time of the event was missing. Date of the event was included in all logs, but the Date Completed was not included in any, although some of the events were undoubtedly completed the same day.
No recommendations for this finding
F5a
We found that the Department has specific policies for monitoring contracts, which are set forth in the City of Stockton, Contract Procedure and Process manual (last revised August 2002). This same manual sets forth the contract threshold amount ($25, 757) below which competitive bidding procedures are not required. We found that the Department did have a contract for landscaping that was recently terminated because of unsatisfactory performance by the contractor. Since then another contractor has been given that work and that contractor's performance is being monitored. Therefore, we believe that procedures are in place to monitor contractor performance and those procedures are being followed.
No recommendations for this finding
F5b
We also reviewed information submitted to us by the complainant regarding five contracts given to a single painting contractor in amounts ranging from $5,450 to $14,000, totaling $57,750 during the time period from May 24, 2002 to October 17, 2002. All of these contracts involved separate painting tasks for tanks, pipe brackets and columns. Since each contract amount was below the $25, 757 limit for competitive bidding procedures, the solicitation of at least three bids was not required under the City's current contract policies. We also contacted Mr. Gittings for an explanation of these contracts and were told that earlier this year several areas at the Tertiary Plant needed painting, including the acid storage tanks, dissolved air pressurization tanks, and overhead fiberglass piping. Three painting contractors were called in to give bids on the three projects. Each of the three areas was bid separately as independent projects. One contractor looked at the three jobs but chose not to submit proposals. The three areas are different in configuration and the competitive bids for each project were requested. One contractor was the low bidder for all three projects, and was awarded all three projects under separate purchase orders. The same contractor was later issued a purchase order for $14,000 to paint the primary clarifiers at the Main Plant. Because they were still on site and there were concerns with the approaching rainy season, they were awarded this project without competitive bidding. Mr. Ed Wall, a Senior Buyer for the City, approved the requisition and purchase order since the contractor had consistently been the low bidder on the other three previous projects. Therefore, we found no improprieties with the awarding of the five separate painting contracts to a single contractor. Regarding alleged failure to report vehicle accidents: The complaint alleges that operations vehicles show signs of abuse and neglect, with damaged front fenders and rear bumpers. Any accident is to be reported to the Corp Yard and Safety committee, but this is not occurring.
No recommendations for this finding
F6
We found that the Department has procedures covering damages to City property (FIN-020), equipment accountability (FIN-003), equipment maintenance and repair (PW-008), and motor vehicle accidents (FIN-019). We requested and reviewed recent vehicle accident reports on file for Department vehicles. We also requested and reviewed MUD Safety Committee minutes, which document the review, discussion, and recommendations regarding a recent vehicle accident involving a Department utility truck (although no recommendations were contained in the particular minutes we reviewed). We requested and reviewed the inspection records for representative Department vehicles, including a maintenance crane (boom truck), which logs 22-point (including damage to structures) inspections on 12 days in a single month, and a tertiary site vehicle, which logs daily 7-point inspections for a nine-day period. We were informed by Mr. Gittings that some vehicles are driven by 10 to 20 different individuals in the Department at one time or another. Some of the vehicles are pretty old and not in the best of condition anyway. Although attempts are made to monitor the conditions of vehicles, it is sometimes difficult to get timely reporting of damage and therefore difficult to fix accurate responsibility. Therefore, we find that procedures are in place and being implemented to monitor and inspect vehicles for damage and to address reported accidents when they occur. Even so, some incidental, unreported damage to Department vehicles does occur. Regarding alleged failure to follow CAL OSHA requirements for Confined Space Entry, Hot Work permits, Lock and Tag permits: The complaint alleges that the Seniors and Supervisors are not fully complying with the requirements. When there is entry into Primary, Secondary, and DAF tanks a confined space permit is not filled out, posted or followed through on. The same thing occurs with Hot Work Permits and Lock and Tag permits. This puts the employees at risk and the City at risk for fines.
No recommendations for this finding
F7
Employee training policies and training program description
No recommendations for this finding
F7a
We requested and reviewed the Department's Confined Space Pre-entry Checklist. A confined space is entered through an opening other than a door or requires the use of a ladder or rungs to reach the working level. Each checklist has nine Yes/No questions that must be answered in the affirmative before entry, a requirement that "Your supervisor MUST be notified of your intent to enter the confined space", the job location, the worker's signature, and the date. We also requested and reviewed the Department's Confined Space Permit forms. We reviewed filled-out confined space entry checklists and permits with recent dates. Therefore we find that confined space entry procedures are in place and being implemented.
No recommendations for this finding
F7b
We requested and reviewed the Department's Hot Work Permit forms. Hot work includes welding, cutting, brazing, or similar flame or spark-producing operations. Mr. Gittings informed us that hot work permits are only required for work conducted in the field and are attached to work orders. We reviewed filled-out hot work permits with recent dates. Therefore we find that hot work procedures are in place and being implemented.
No recommendations for this finding
F7c
We found that the Department has extensive policies for Lockout/Tagout procedures that are set forth in directive No. SAF-18, dated 6-6-2001. This program is established in accordance with California Code of Regulations, Title 8, CCR §3314, "Cleaning, Repairing, Servicing, and Adjusting Prime Movers, Machinery and Equipment" and Code of Federal Regulations, CFR §1910.147, "Control of Hazardous Energy (Lockout-Tagout)". The purpose of the program is to protect maintenance personnel when they are working on equipment or systems that could be activated by other personnel during the maintenance procedures. The program uses a system of tags and physical locks to provide warnings and to physically isolate the machinery or systems from sources of energy. The program requires that a Lockout/Tagout Log be kept that records the following five information items for each lockout/tagout operation performed: 1. Date/Time/Initials 2. Lock # 3. Tagged Out - Yes/No 4. Location/Reason 5. Date Completed We requested the Department's Lockout/Tagout Log and were provided with three different kinds of logs that contained entries that recorded lockout/tagout events interspersed among other maintenance events. No master lockout/tagout log was provided. We found that none of the logs included all of the information items required for the Lockout/Tagout Log by directive SAF-18. Missing in all of these logs was the Lock #, and in some instances the Time of the event was missing. Date of the event was included in all logs, but the Date Completed was not included in any, although some of the events were undoubtedly completed the same day.
No recommendations for this finding
F8
Employee certification policies and certification program description
No recommendations for this finding
F9
Contract management/administration guidelines/manual
No recommendations for this finding
F10
Procedures for awarding contracts and purchasing equipment and services under bid
No recommendations for this finding
F12
Personnel promotion policies
No recommendations for this finding
F13
Any complaints received regarding failures to comply with CAL OSHA workplace safety requirements - nature of complaints, steps taken to address the complaints, and status of the complaints.
No recommendations for this finding