Mendocino County Grand Jury

2018-2019

6 reports

Findings & Recommendations 7 findings
F1: Mendocino County does not have a dedicated CSU, CRT or PHF at this time.
F2: The Committee meets for two hours each month.
F3: The Committee has identified three potential sites for the CSU, CRT and PHF; however, no site has been chosen by the BOS.
Related Recommendations (4)
R1: the Committee form two ad hoc committees, one focusing on site location and construction and the other on operations and treatment,
R2: the Committee can address policies, procedures and job descriptions during construction,
R3: the BOS prepare and publicize a plan with goals and timelines for the completion of the CSU, CRT and PHF, e.g. Mendocino County website and local news media,
R4: the BOS’ priority should be planning and construction of the three facilities. RESPONSES Pursuant to Penal Code §933.05, responses are required from the following individual(s): From the following governing bodies:  Board of Supervisors (F1-F7 and R1-R4) The governing bodies indicated above should be aware that the comment or response of the governing body must be conducted subject to the notice, agenda and open meeting requirements of the Brown Act. 5
F4: All recommendations by the Committee must be approved by the BOS.
F5: The Committee recommended, and the BOS approved, hiring a project manager.
F6: Two additional MOPS were recommended by the Committee.
F7: The eleven-member committee can be unwieldy with its variety of perspectives, opinions and expertise.
Findings & Recommendations 14 findings
F1: The lawsuit settlement between the City and District left unresolved issues resulting in current arbitration, and continued duplication of services and costs.
Related Recommendations (1)
R1: the City and District work together to find a way to manage the overall sewer system as a single entity equitably and efficiently for all ratepayers,
F2: There is only one sewage collection and treatment system which serves both the City and District.
F3: The City and District being jointly responsible for the single sanitation system has led to significant needless expense.
Related Recommendations (1)
R1: the City and District work together to find a way to manage the overall sewer system as a single entity equitably and efficiently for all ratepayers,
F4: Due to limited staffing and high turnover, the District has not demonstrated the capability to responsibly manage its business and financial affairs. Failure to provide audited financial reports for five years (2014-2018) further demonstrates this lack of capability.
F5: In the absence of staffing continuity with technical and financial expertise, the District has used expensive attorneys and consultants to conduct day-to-day business and negotiations with the City. 6
F6: The District claims the funds paid to them by the City are for damages. This is misleading. Of the $16,415,296 paid, $11,431,986 were from existing District reserves held by the City on the District’s behalf.
F7: To avoid further legal expense, the City agreed to pay the District $4,984,310 over five years. This amount is substantially less than the legal costs of the lawsuit to the District. The difference will be paid by the District’s ratepayers.
F8: The City’s settlement and legal expenses will be borne by the City’s ratepayers.
F9: The City no longer holds any of the District’s reserves.
F10: The District’s claim that it can save over $1.5 million per year by assuming responsibility for the billing, maintenance and sewage treatment for its ratepayers is not supported by any documentation.
Related Recommendations (1)
R3: the District provide specific details to ratepayers for its claims that it can save over $1.5 million per year by assuming billing, maintenance and sewage treatment responsibilities with a detailed feasibility and cost analysis, 7
F11: Future changes allowed in the settlement could trigger redundant expenses to be borne by all ratepayers. These include detachment of the overlap areas by the City and the District’s assumption of their billing, maintenance, and sewage treatment.
F12: The MOU/JPA proposed by the City is intended to provide a cost effective solution to the ongoing disputes between the City and the District by operating as a single system with the same rate structure applying to all customers.
Related Recommendations (1)
R2: the District enter into negotiations with the City regarding the proposed MOU/JPA,
F13: The District has violated the intent of the Brown Act which has reduced transparency for District ratepayers.
Related Recommendations (1)
R4: the District Board must act in accordance with the Brown Act which promotes transparency and public participation.
F14: The $23 million combined legal costs and lost opportunities to refinance the bond will be borne by the City and District ratepayers.
Findings & Recommendations 6 findings
F1: Innovations (creative teaching methodologies which benefit students) at any school are neither utilized nor shared between charter and district schools.
Related Recommendations (1)
R1: the MCOE should facilitate structured discussions and interactions between district and charter schools for the benefit of all students, teachers and parents, to include training days for all credentialed and teaching personnel to improve teaching methodologies,
F2: Since district schools operate under more restrictive rules and regulations, it is difficult for the district schools to offer some of the same options or programs as the charter schools.
Related Recommendations (1)
R2: schools should offer parents and guardians training on the tools available to evaluate and compare schools within the districts, e.g., SARC and API. Offering this allows the students to enroll in the school which is best aligned with their needs,
F3: The district schools are changing their curricula to attract students and increase their ADA funding.
Related Recommendations (1)
R3: post a link to the school, district and state SARC and API scores on the school’s website, 5
F4: Where existing, the assigned oversight person between the district and the charter schools has not looked for opportunities to broaden the success of the district schools. Currently, the GJ found no evidence of collaborative processes between the charter and district schools.
Related Recommendations (1)
R4: build a space on the MCOE website for teachers at any school in Mendocino County to publish tips and suggestions to improve the classroom experience, e.g., behavior and teaching methodologies.
F5: Many parents are not aware of the availability, or even the existence, of SARC, API, and other scores and reports to determine the best educational experience for their students. Parents have traditionally not been educated in the availability of these tools.
F6: The GJ has found in Mendocino County the mission of charter schools as originally envisioned has not been fulfilled.
Findings & Recommendations 9 findings
F1: There is no published long term county-wide strategic planning by the BOS, e.g., fire response, homelessness, cannabis, housing and economic development.
Related Recommendations (1)
R1: strategic goals should be formulated by the BOS each year, prioritized and posted on the BOS page of the County website,
F2: There is no written succession plan for the CEO of Mendocino County.
Related Recommendations (1)
R2: develop a succession plan for the CEO position,
F3: The BOS does not adequately track directives given to the CEO. The current list of directives has inadequate status and descriptors and there are no timelines or milestones for completion.
Related Recommendations (1)
R3: determine whether an Assistant CEO position is necessary. If the position is not going to be filled, it should be unfunded,
F4: The CEO Report does not include substantive department updates, e.g. new jail addition, Sheriff overtime, BOS directive status, departmental statistics and major road project status.
Related Recommendations (1)
R4: the BOS needs to include expectations for completion at the time directives are given to the CEO,
F5: The Consent Agenda has often included controversial items, e.g. salary increases and cost over runs.
Related Recommendations (1)
R5: directive status should include goal, proposed action, funding status and primary agency,
F6: In the BOS minutes, the name of the public speaker is listed but not a description of the issue raised.
Related Recommendations (1)
R6: the BOS meeting agenda should include directives and status updates, 4
F7: There are no scheduled proactive meetings with residents of individual districts to speak with their Supervisor.
Related Recommendations (1)
R7: improve the CEO Report to include information on current major projects, tracking, expenditures and strategic goals,
F8: The GJ could not find a complaint or issue form on the Mendocino County website.
Related Recommendations (1)
R8: the Consent Agenda should not include controversial items, e.g., salary adjustments or cost Overruns,
F9: There is no procedural requirement for any Supervisor to respond to a constituent complaint or issue.
Related Recommendations (1)
R9: the BOS minutes should include the name of the speaker and the issue raised during public expression,
Additional Recommendations 3

Not linked to specific findings.

R10: publicized, regularly scheduled district town hall meetings should be held by each Supervisor,
R11: the BOS page of the County website should contain an embedded complaint/issue form that requires sender contact information sent directly to the individual supervisor,
R12: the BOS should draft and publish a policy for responding to constituent complaints and issues. The policy should include an expectation of timely response by the Supervisor. RESPONSES Pursuant to Penal Code §933 responses are required within 60 days from the following individuals from the following governing bodies:  Board of Supervisors (F1-F3,F5-F9 and R1,R2,R4-6,R8-R12) Pursuant to Penal Code 933.05, responses are required within 90 days from the following individuals from the following governing bodies:  Chief Executive Officer (F2-F5,F8 and R2,R3,R5,R7-R9,R11) The governing bodies indicated above should be aware that the comment or response of the governing body must be conducted subject to the notice, agenda and open meeting requirements of the Brown Act.
Findings & Recommendations 4 findings
F2: The City ofUkiah's antiquated financial systems have added to the tension between the two organizations.
Related Recommendations (1)
R2: The UVSD complete the creation of its own accounting system. (F2)
F3: The unilateral management by the City ofUkiah has resulted in fees/fmes that the UVSD has been requu'ed to pay. City upper management has shown a lack of respect to UVSD by being unresponsive to requests, and expecting UVSD to immediately concur with the city's decisions.
Related Recommendations (1)
R3: The UVSD use legal counsel to recapture lost revenues irom the City ofUkiah. (F3)
F4: The Participation Agreement (PA) is not a workable document and has a clear bias towards the City ofUkiah.
Related Recommendations (1)
R4: The UVSD seek legal counsel regarding options to disassociate from the Participation Agreement. (F4)
F5: LAFCo is m a position to facilitate resolution of conflicts between agencies by means of the municipal service review and sphere of influence.
Related Recommendations (1)
R5: LAFCo conduct a feasibility study on consolidation of sewer and water agencies and provide conflict resolution between UVSD and the City ofUkiah. (F5)
Findings & Recommendations 48 findings
F1: On July 6, 1954, the Board of Supervisors created the Ukiah Valley Sanitation District. The District was to be governed by two Mendocino County Supervisors and one Ukiah City Council Member, all appointed by their respective governing bodies.
F2: Negotiations between the City and the District resulted in an agreement to allow the City treatment plant to be used by the District. The agreement called for the City to construct the treatment facility and the District to pay for costs to install the necessary north-south pipelines (trunk sewer) to transport the waste to the plant. The work on both projects was completed in 1959. A District bond issue was passed to pay for sewer lines into some of the formerly unserved areas. Some areas within the District, such as Fireside Village, chose to opt out of being included in the sewer service area. The District chose not to set up its own operations for such tasks as maintenance, billing and collections but rather negotiated with the City to provide the following services: • Treating wastewater generated within the District at the City-owned wastewater treatment facility • Operation and maintenance of its sewer collection system in accordance with District ordinances, policies, procedures and industry standards » Meeting all required Federal and State regulations • Performing minor engineering and construction projects within the District a Billing and collection of monthly user fees e Receiving fees and charges and for making inspections of new connections ® Maintaining financial records and performing transactions relative to certain District revenue and expenditure accounts On July 19, 1995, the City of Ukiah and the District entered into a new Participation Agreement for the operation of joint sewer facilities. The agreement was modified three times: March 24, 1999, December 15, 2004, and March 2, 2006. The following are key elements of the Agreement, as modified: a. The City shall operate, maintain and repair the District's collection system, in accordance with the District rules, regulations and ordinances. b. The City and District are prohibited from contracting for sewage treatment outside the District boundaries without the consent of both parties. c. New connections may only be made at points that are mutually agreeable to the City and District. d. Costs of treatment shall be apportioned annually based on the ratio, as of each March 31, of the number of equivalent sewer service units (ESSUs) of each jurisdiction. An ESSU is a unit calculated as discharge from a typical single family residential unit. e. The City shall be the paying and receiving agent for all District and City maintenance and operation funds. f. The City shall comply with specified insurance requirements. g. The City shall maintain complete records and accounts related to costs and expenditures and all sewer revenues collected. h. The City shall retain title, management responsibility and control of the sewer treatment plant including additions or changes. City personnel shall maintain, operate and control the treatment plant and also service and maintain all trunk and collection lines. i. The District shall establish ordinances, resolutions, rules and regulations for administration of the District's system. j. The District shall set connection, service, permit and inspection fees and capacity charges. Fees shall be sufficient to reimburse the City in amounts calculated by the City. k. The original Agreement specifies a 30-year term, to July 2025, with an option for either partner to cancel upon 5 years advance written notice. However, the financing agreement includes an extension to 2036, the final maturity of the Association of Bay Area Governments (ABAG) bonds. It precludes cancellation or termination of the Agreement unless the District enters into a substantially identical agreement with ABAG or prepays all future allocated debt service to the City. I. The total annual debt service due from the City and District on the revenue bonds for expansion and upgrading of the plant averages $4.9 million through
F3: the City Council and District Board secure input from Mendocino County, LAFCO and other planning bodies and review all available area-wide planning documents prior to making decisions about future expansion and ESSU determinations. (Findings 22, 48)
F4: the City Council and District Board base final determination of future plant expansion on a detailed financial study that addresses the potential economic impacts on current and future users, strategies for dealing with changing economic conditions, and the ability of City and District ratepayers to meet current and future indebtedness. (Findings 5-6, 40, 47)
Related Recommendations (4)
R8: any actions or services requested of the City (by the District) beyond the existing Agreement be documented in supplemental agreements that are negotiated, budgeted and funded by the District independently of the restricted Operating and Maintenance (O&M) funds in Account 612. (Findings 4-5, 49)
R11: the City Council and District Board conduct a joint mid-year sewer budget hearing no later than January 31 each year to compare actual revenue and expenditures with budget estimates, review the status of budgeted activities and consider maintenance and capital improvement goals. (Findings 4-5, 45- 47)
R19: the City and District re-visit the Participation Agreement and subsequent amendments, review their respective needs for efficient, cost-effective and transparent operations and make revisions, as required, to ensure transparency and a unified approach for providing sewer service. (Findings 4-5, 49)
R47: 12. the City and District notify and keep each other fully informed of all activities that might directly or indirectly impact the other such as planning for boundary changes, annexation of new areas, proposed subdivisions, collection system extensions, new connections, major maintenance projects, "will serve" commitments, permits for pre-treatment facilities, or any legal or financial issues. (Findings 38, 43) 13. the City and District adopt similar, if not identical policies, procedures, standards for construction, user rates, and miscellaneous fees and charges wherever possible. (Findings 5-6, 19) 14.the City, while exercising its obligations of the Participation Agreement and amendments thereto retain sole authority, discretion and responsibility for selection and employment of administrative, operating and maintenance personnel for the unified City/District system along with the right to establish appropriate pay schedules. (Finding 5) 15. the District, apart from its contractual relationship with the City under existing Agreements, retain its identity, and continue exercising power and discretion as an independent special district. (Findings 37, 43) 16. the City employ only appropriately certified operating and maintenance personnel including those in direct supervisory or administrative positions in the sewer division of the City's Public Works Department. (Findings 5, 7) 17. the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40) 18. the District continue to hold regular monthly meeting dates and special meetings as needed. (Finding 28) 19. the City and District re-visit the Participation Agreement and subsequent amendments, review their respective needs for efficient, cost-effective and transparent operations and make revisions, as required, to ensure transparency and a unified approach for providing sewer service. (Findings 4-5, 49)
F5: the City and District maintain a central list of prioritized projects but that they only include in annual budgets items for which funds and staffing have been identified. (Finding 33)
Related Recommendations (8)
R4: the City Council and District Board base final determination of future plant expansion on a detailed financial study that addresses the potential economic impacts on current and future users, strategies for dealing with changing economic conditions, and the ability of City and District ratepayers to meet current and future indebtedness. (Findings 5-6, 40, 47)
R8: any actions or services requested of the City (by the District) beyond the existing Agreement be documented in supplemental agreements that are negotiated, budgeted and funded by the District independently of the restricted Operating and Maintenance (O&M) funds in Account 612. (Findings 4-5, 49)
R10: the City develop accounting procedures to accurately allocate costs, including the full cost of equipment used for maintenance of City water, City sewer, District sewer, and for use by other City Departments in a manner that will permit monthly expense reports for each entity. (Findings 5, 37)
R11: the City Council and District Board conduct a joint mid-year sewer budget hearing no later than January 31 each year to compare actual revenue and expenditures with budget estimates, review the status of budgeted activities and consider maintenance and capital improvement goals. (Findings 4-5, 45- 47)
R13: the City and District adopt similar, if not identical policies, procedures, standards for construction, user rates, and miscellaneous fees and charges wherever possible. (Findings 5-6, 19) 14.the City, while exercising its obligations of the Participation Agreement and amendments thereto retain sole authority, discretion and responsibility for selection and employment of administrative, operating and maintenance personnel for the unified City/District system along with the right to establish appropriate pay schedules. (Finding 5)
R16: the City employ only appropriately certified operating and maintenance personnel including those in direct supervisory or administrative positions in the sewer division of the City's Public Works Department. (Findings 5, 7)
R19: the City and District re-visit the Participation Agreement and subsequent amendments, review their respective needs for efficient, cost-effective and transparent operations and make revisions, as required, to ensure transparency and a unified approach for providing sewer service. (Findings 4-5, 49)
R47: 12. the City and District notify and keep each other fully informed of all activities that might directly or indirectly impact the other such as planning for boundary changes, annexation of new areas, proposed subdivisions, collection system extensions, new connections, major maintenance projects, "will serve" commitments, permits for pre-treatment facilities, or any legal or financial issues. (Findings 38, 43) 13. the City and District adopt similar, if not identical policies, procedures, standards for construction, user rates, and miscellaneous fees and charges wherever possible. (Findings 5-6, 19) 14.the City, while exercising its obligations of the Participation Agreement and amendments thereto retain sole authority, discretion and responsibility for selection and employment of administrative, operating and maintenance personnel for the unified City/District system along with the right to establish appropriate pay schedules. (Finding 5) 15. the District, apart from its contractual relationship with the City under existing Agreements, retain its identity, and continue exercising power and discretion as an independent special district. (Findings 37, 43) 16. the City employ only appropriately certified operating and maintenance personnel including those in direct supervisory or administrative positions in the sewer division of the City's Public Works Department. (Findings 5, 7) 17. the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40) 18. the District continue to hold regular monthly meeting dates and special meetings as needed. (Finding 28) 19. the City and District re-visit the Participation Agreement and subsequent amendments, review their respective needs for efficient, cost-effective and transparent operations and make revisions, as required, to ensure transparency and a unified approach for providing sewer service. (Findings 4-5, 49)
F6: The Agreement clearly calls for the City and the District sewer systems to be operated and maintained as a single enterprise system with operating costs apportioned to the City and the District based on the ratio of City/District ESSUs.
Related Recommendations (3)
R4: the City Council and District Board base final determination of future plant expansion on a detailed financial study that addresses the potential economic impacts on current and future users, strategies for dealing with changing economic conditions, and the ability of City and District ratepayers to meet current and future indebtedness. (Findings 5-6, 40, 47)
R13: the City and District adopt similar, if not identical policies, procedures, standards for construction, user rates, and miscellaneous fees and charges wherever possible. (Findings 5-6, 19) 14.the City, while exercising its obligations of the Participation Agreement and amendments thereto retain sole authority, discretion and responsibility for selection and employment of administrative, operating and maintenance personnel for the unified City/District system along with the right to establish appropriate pay schedules. (Finding 5)
R47: 12. the City and District notify and keep each other fully informed of all activities that might directly or indirectly impact the other such as planning for boundary changes, annexation of new areas, proposed subdivisions, collection system extensions, new connections, major maintenance projects, "will serve" commitments, permits for pre-treatment facilities, or any legal or financial issues. (Findings 38, 43) 13. the City and District adopt similar, if not identical policies, procedures, standards for construction, user rates, and miscellaneous fees and charges wherever possible. (Findings 5-6, 19) 14.the City, while exercising its obligations of the Participation Agreement and amendments thereto retain sole authority, discretion and responsibility for selection and employment of administrative, operating and maintenance personnel for the unified City/District system along with the right to establish appropriate pay schedules. (Finding 5) 15. the District, apart from its contractual relationship with the City under existing Agreements, retain its identity, and continue exercising power and discretion as an independent special district. (Findings 37, 43) 16. the City employ only appropriately certified operating and maintenance personnel including those in direct supervisory or administrative positions in the sewer division of the City's Public Works Department. (Findings 5, 7) 17. the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40) 18. the District continue to hold regular monthly meeting dates and special meetings as needed. (Finding 28) 19. the City and District re-visit the Participation Agreement and subsequent amendments, review their respective needs for efficient, cost-effective and transparent operations and make revisions, as required, to ensure transparency and a unified approach for providing sewer service. (Findings 4-5, 49)
F7: The City must constantly be in a planning mode in order to meet current and anticipated state and federal regulations and to secure the required five-year renewals of their National Pollutant Discharge Elimination System (NPDES) permit.
Related Recommendations (1)
R1: the City Council and District Board hold joint briefings at the earliest stages of planning and discussion for National Pollutant Discharge Elimination System (NPDES) permit renewal and/or consideration of plant upgrading or expansion, and that they continue joint briefings throughout any subsequent project. (Findings 7, 10, 14, 28-29, 47)
F8: In the late 1990s the City and District agreed that the plant needed more capacity to accommodate projected development over the next 15 to 20 years. The City and District planned for a reasonable expansion of ESSUs, taking into account the limited ability of the current ratepayers to repay the associated debt.
F9: A preliminary study of the plant was completed by Kennedy /Jenks Engineering Consultants in 2000. The study considered current plant treatment capacity and provided the City and the District with an independent evaluation of future capacity needs and estimated costs.
F10: On May 23, 2001 results of the Kennedy/Jenks study were presented to the District Board. A similar briefing was made to the City Council the previous month. Minutes indicate that both entities recognized the need to proceed with final planning for a plant upgrade and expansion project. 11 .At the July 24, 2002 meeting action was taken to adopt a 50/50 cost sharing between the City and District for engineering expenses associated with the City of Ukiah Wastewater Treatment Plant project.
F11: the City Council and District Board conduct a joint mid-year sewer budget hearing no later than January 31 each year to compare actual revenue and expenditures with budget estimates, review the status of budgeted activities and consider maintenance and capital improvement goals. (Findings 4-5, 45- 47)
F12: After a formal request for proposal (RFP) process seeking preliminary design and cost estimates, Brown and Caldwell, Consulting Engineers was selected by the City with District concurrence.
F13: Brown and Caldwell's estimated costs for the upgrade and expansion substantially exceeded previous estimates presented in the 2000 Kennedy/Jenks report.
F14: In response to concerns about the cost of the plant project, the City and District authorized a "value engineering" study to examine various aspects of Brown and Caldwell's preliminary design and to make recommendations for appropriate cost-cutting measures that would not affect overall upgrading and expansion goals.
F15: This study delayed the project for six months. During the delay, construction costs increased considerably.
F16: The financial consulting firm, Bartle Wells was hired to provide an initial analysis and recommendation for financing the cost obligations based on the preliminary engineering estimates by Brown and Caldwell. A follow-up analysis was made after the low bid was received.
F17: Bartle Wells recommended that costs for the expanded capacity of the plant be met by adjusting fees and charges on new hookups in the City and District. 18-BartIe Wells also recommended that the current and future users in the City and District pay for the plant upgrade portion of the project through a series of five rate increases on the monthly sewer service charges.
F18: the District continue to hold regular monthly meeting dates and special meetings as needed. (Finding 28)
F19: On November 2, 2005, the District and the City separately adopted identical sewer service fee schedules for the five fiscal years allowing annual adjustments through June 30, 2010. Approval proceedings were conducted in compliance with Proposition 218 (Articles XIIIC and XIIID of the State constitution) calling for public notice and majority protest hearings for service based user fees. This obviated the need for electoral approval of tax increases. The final rate increase is scheduled to be implemented on July 1, 2009 and to remain in effect through June 30, 2010.
F20: The City and District entered into an agreement on March 2, 2006 to secure financing for the plant project and establish the procedure for the District to pay its share of the installment payments.
F21: The City has the primary obligation for repayment of the $75,060,000 in revenue bonds issued by the Association of Bay Area Governments (ABAG) for the project. Upgrades and rehabilitation costs are to be paid on the same basis as operating costs. This basis is the number of ESSUs billed to each entity and annually adjusted according to the ratio of existing ESSUs. Expansion of the capacity is to be paid by the potential additional ESSUs allocated to each entity and the loan interest charges are to be paid by the new hook-ups.
F22: More of the additional hookups were allocated to the District because more growth was projected outside the City limits. This obligated the District to a greater share of the long-term financial obligation.
Related Recommendations (1)
R3: the City Council and District Board secure input from Mendocino County, LAFCO and other planning bodies and review all available area-wide planning documents prior to making decisions about future expansion and ESSU determinations. (Findings 22, 48)
F23: Both the City and the District initially approved the Wastewater Treatment Plant upgrading and expansion project and authorization was given to City staff to proceed with a call for construction bids. The Kiewit Pacific Company bid was accepted and the contract was awarded on October 17,2005.
F24: Completion of the multi-year plant project is anticipated by June 2009, ahead of schedule and under budget.
F25: Former members of the District Board have reported a "lack of communication or transparency" and not consistently receiving timely information from City staff and City administration. This situation is alleged to have occurred mostly leading up to the current plant project and following the implementation of the 1995 Participation Agreement.
Related Recommendations (2)
R6: the City Staff provide the City Council and District Board with monthly reports including but not limited to: • revenue and expenditures (Account 612) with comparisons with the budget • summaries of new connections • field maintenance and inspection activities • overflows and/or treatment plant process malfunctions, if any, actions taken and any fines incurred. (Findings 25-27, 30) 3 The report of the Ad Hoc committee is available on the Grand Jury website as a backup document to this report www.co.mendocino.ca.us/arandiury
R7: the City Staff, City Council and the District Board and Manager regularly exchange information, as needed, including: » updates on major projects « inquiries regarding new connections ® status of pending projects and/or planning activities in each entity » relevant information such as complaints, inspections by regulatory agencies, etc. during the past month. (Findings 25-28)
F26: In recent years the District has sought increasingly detailed information from the City.
Related Recommendations (2)
R6: the City Staff provide the City Council and District Board with monthly reports including but not limited to: • revenue and expenditures (Account 612) with comparisons with the budget • summaries of new connections • field maintenance and inspection activities • overflows and/or treatment plant process malfunctions, if any, actions taken and any fines incurred. (Findings 25-27, 30) 3 The report of the Ad Hoc committee is available on the Grand Jury website as a backup document to this report www.co.mendocino.ca.us/arandiury
R7: the City Staff, City Council and the District Board and Manager regularly exchange information, as needed, including: » updates on major projects « inquiries regarding new connections ® status of pending projects and/or planning activities in each entity » relevant information such as complaints, inspections by regulatory agencies, etc. during the past month. (Findings 25-28)
F27: City staff members have acknowledged past shortfalls in providing information to the District and are considering a new accounting system that might improve responsiveness. Some argue that the City is not sufficiently staffed to provide all the information that the District may desire and that more detailed accounting would not be cost-effective in terms of ratepayer benefits.
Related Recommendations (2)
R6: the City Staff provide the City Council and District Board with monthly reports including but not limited to: • revenue and expenditures (Account 612) with comparisons with the budget • summaries of new connections • field maintenance and inspection activities • overflows and/or treatment plant process malfunctions, if any, actions taken and any fines incurred. (Findings 25-27, 30) 3 The report of the Ad Hoc committee is available on the Grand Jury website as a backup document to this report www.co.mendocino.ca.us/arandiury
R7: the City Staff, City Council and the District Board and Manager regularly exchange information, as needed, including: » updates on major projects « inquiries regarding new connections ® status of pending projects and/or planning activities in each entity » relevant information such as complaints, inspections by regulatory agencies, etc. during the past month. (Findings 25-28)
F28: Recorded minutes show that District meetings were held sporadically during the planning and formative phases of the plant project. For example, only three District Board meetings were held in 2000, two of which were related to consideration and adoption of the annual budget.
Related Recommendations (5)
R1: the City Council and District Board hold joint briefings at the earliest stages of planning and discussion for National Pollutant Discharge Elimination System (NPDES) permit renewal and/or consideration of plant upgrading or expansion, and that they continue joint briefings throughout any subsequent project. (Findings 7, 10, 14, 28-29, 47)
R7: the City Staff, City Council and the District Board and Manager regularly exchange information, as needed, including: » updates on major projects « inquiries regarding new connections ® status of pending projects and/or planning activities in each entity » relevant information such as complaints, inspections by regulatory agencies, etc. during the past month. (Findings 25-28)
R17: the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40)
R18: the District continue to hold regular monthly meeting dates and special meetings as needed. (Finding 28)
R47: 12. the City and District notify and keep each other fully informed of all activities that might directly or indirectly impact the other such as planning for boundary changes, annexation of new areas, proposed subdivisions, collection system extensions, new connections, major maintenance projects, "will serve" commitments, permits for pre-treatment facilities, or any legal or financial issues. (Findings 38, 43) 13. the City and District adopt similar, if not identical policies, procedures, standards for construction, user rates, and miscellaneous fees and charges wherever possible. (Findings 5-6, 19) 14.the City, while exercising its obligations of the Participation Agreement and amendments thereto retain sole authority, discretion and responsibility for selection and employment of administrative, operating and maintenance personnel for the unified City/District system along with the right to establish appropriate pay schedules. (Finding 5) 15. the District, apart from its contractual relationship with the City under existing Agreements, retain its identity, and continue exercising power and discretion as an independent special district. (Findings 37, 43) 16. the City employ only appropriately certified operating and maintenance personnel including those in direct supervisory or administrative positions in the sewer division of the City's Public Works Department. (Findings 5, 7) 17. the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40) 18. the District continue to hold regular monthly meeting dates and special meetings as needed. (Finding 28) 19. the City and District re-visit the Participation Agreement and subsequent amendments, review their respective needs for efficient, cost-effective and transparent operations and make revisions, as required, to ensure transparency and a unified approach for providing sewer service. (Findings 4-5, 49)
F29: Despite a lack of involvement in the planning process, recorded minutes indicate that from mid-2002, the Board did become more vigilant and ultimately concurred with all plant project decisions and participated in public hearings for establishing the new user rates and new connection fees.
Related Recommendations (1)
R1: the City Council and District Board hold joint briefings at the earliest stages of planning and discussion for National Pollutant Discharge Elimination System (NPDES) permit renewal and/or consideration of plant upgrading or expansion, and that they continue joint briefings throughout any subsequent project. (Findings 7, 10, 14, 28-29, 47)
F30: The City maintains accounting records on the basis of a single unified sewer enterprise fund. Financial statements are audited annually by independent certified public accountants as part of the normal audit requirement. The City's audit reports have been timely and contain "clean audit" opinion letters.
F31: The Participation Agreement requires the City "...to maintain complete records and accounts..." but it does not appear to require the City to differentiate City and District financial information. Until recently, there have not been separate audit reports for the District. This practice has been publicly criticized.
F32: In 2007 an audit firm, other than the City's, was engaged to examine the District books for the period 2001 through 2005. The auditors reported that because the City did not allocate costs between the District and City, available data were inadequate to support an independent audit report for the District. However, the firm subsequently completed an audit for 2006-07 that was accepted by the District Board and forwarded to the State.
F33: Budgets proposed by the City and approved by the District have regularly included more approved major maintenance projects than were achievable with the available level of funding and staff.
Related Recommendations (1)
R5: the City and District maintain a central list of prioritized projects but that they only include in annual budgets items for which funds and staffing have been identified. (Finding 33)
F34: Mutual disrespect and a lack of cooperation have developed between some representatives of the City and the District.
Related Recommendations (2)
R2: the City Council and District Board schedule periodic orientation workshops for City Council and District Board Members to ensure that all members understand their shared responsibility for providing sewer service in the Ukiah Valley. (Findings 34-36)
R9: any expense for a purpose specifically benefiting one entity, and not of value to the other, be separately budgeted and funded. (Findings 34, 44,46)
F35: In May 2008, the District established a part-time District Manager Position.
Related Recommendations (1)
R2: the City Council and District Board schedule periodic orientation workshops for City Council and District Board Members to ensure that all members understand their shared responsibility for providing sewer service in the Ukiah Valley. (Findings 34-36)
F36: In November 2008, the District changed from a dependent to an independent district. The composition of the board changed from having three appointed members to having five elected members who reside in the District. The five- member board took office in December 2008. Dependent districts are governed in full by individuals appointed by other existing legislative bodies like a city council or board of supervisors. Independent districts are governed by a board of directors elected directly by the district's voters or appointed to a fixed term of office by another legislative body such as a board of supervisors.
Related Recommendations (1)
R2: the City Council and District Board schedule periodic orientation workshops for City Council and District Board Members to ensure that all members understand their shared responsibility for providing sewer service in the Ukiah Valley. (Findings 34-36)
F37: As an independent single purpose, enterprise district, the District is dependent on service fees and tax revenues to meet capital and operating needs. As an independent district, it is required to perform an outside audit annually unless the board and board of supervisors approve biannual audits.
Related Recommendations (2)
R15: the District, apart from its contractual relationship with the City under existing Agreements, retain its identity, and continue exercising power and discretion as an independent special district. (Findings 37, 43)
R47: 12. the City and District notify and keep each other fully informed of all activities that might directly or indirectly impact the other such as planning for boundary changes, annexation of new areas, proposed subdivisions, collection system extensions, new connections, major maintenance projects, "will serve" commitments, permits for pre-treatment facilities, or any legal or financial issues. (Findings 38, 43) 13. the City and District adopt similar, if not identical policies, procedures, standards for construction, user rates, and miscellaneous fees and charges wherever possible. (Findings 5-6, 19) 14.the City, while exercising its obligations of the Participation Agreement and amendments thereto retain sole authority, discretion and responsibility for selection and employment of administrative, operating and maintenance personnel for the unified City/District system along with the right to establish appropriate pay schedules. (Finding 5) 15. the District, apart from its contractual relationship with the City under existing Agreements, retain its identity, and continue exercising power and discretion as an independent special district. (Findings 37, 43) 16. the City employ only appropriately certified operating and maintenance personnel including those in direct supervisory or administrative positions in the sewer division of the City's Public Works Department. (Findings 5, 7) 17. the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40) 18. the District continue to hold regular monthly meeting dates and special meetings as needed. (Finding 28) 19. the City and District re-visit the Participation Agreement and subsequent amendments, review their respective needs for efficient, cost-effective and transparent operations and make revisions, as required, to ensure transparency and a unified approach for providing sewer service. (Findings 4-5, 49)
F38: The first amendment to the Agreement requires joint approval of the annual combined sewer budget (Account 612).
Related Recommendations (3)
R12: the City and District notify and keep each other fully informed of all activities that might directly or indirectly impact the other such as planning for boundary changes, annexation of new areas, proposed subdivisions, collection system extensions, new connections, major maintenance projects, "will serve" commitments, permits for pre-treatment facilities, or any legal or financial issues. (Findings 38, 43)
R17: the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40)
R47: 12. the City and District notify and keep each other fully informed of all activities that might directly or indirectly impact the other such as planning for boundary changes, annexation of new areas, proposed subdivisions, collection system extensions, new connections, major maintenance projects, "will serve" commitments, permits for pre-treatment facilities, or any legal or financial issues. (Findings 38, 43) 13. the City and District adopt similar, if not identical policies, procedures, standards for construction, user rates, and miscellaneous fees and charges wherever possible. (Findings 5-6, 19) 14.the City, while exercising its obligations of the Participation Agreement and amendments thereto retain sole authority, discretion and responsibility for selection and employment of administrative, operating and maintenance personnel for the unified City/District system along with the right to establish appropriate pay schedules. (Finding 5) 15. the District, apart from its contractual relationship with the City under existing Agreements, retain its identity, and continue exercising power and discretion as an independent special district. (Findings 37, 43) 16. the City employ only appropriately certified operating and maintenance personnel including those in direct supervisory or administrative positions in the sewer division of the City's Public Works Department. (Findings 5, 7) 17. the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40) 18. the District continue to hold regular monthly meeting dates and special meetings as needed. (Finding 28) 19. the City and District re-visit the Participation Agreement and subsequent amendments, review their respective needs for efficient, cost-effective and transparent operations and make revisions, as required, to ensure transparency and a unified approach for providing sewer service. (Findings 4-5, 49)
F39: The current plant expansion project provides for 2,400 additional ESSUs and allocates 1560 (65%) to the District and 840 (35%) to the City.
Related Recommendations (2)
R17: the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40)
R47: 12. the City and District notify and keep each other fully informed of all activities that might directly or indirectly impact the other such as planning for boundary changes, annexation of new areas, proposed subdivisions, collection system extensions, new connections, major maintenance projects, "will serve" commitments, permits for pre-treatment facilities, or any legal or financial issues. (Findings 38, 43) 13. the City and District adopt similar, if not identical policies, procedures, standards for construction, user rates, and miscellaneous fees and charges wherever possible. (Findings 5-6, 19) 14.the City, while exercising its obligations of the Participation Agreement and amendments thereto retain sole authority, discretion and responsibility for selection and employment of administrative, operating and maintenance personnel for the unified City/District system along with the right to establish appropriate pay schedules. (Finding 5) 15. the District, apart from its contractual relationship with the City under existing Agreements, retain its identity, and continue exercising power and discretion as an independent special district. (Findings 37, 43) 16. the City employ only appropriately certified operating and maintenance personnel including those in direct supervisory or administrative positions in the sewer division of the City's Public Works Department. (Findings 5, 7) 17. the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40) 18. the District continue to hold regular monthly meeting dates and special meetings as needed. (Finding 28) 19. the City and District re-visit the Participation Agreement and subsequent amendments, review their respective needs for efficient, cost-effective and transparent operations and make revisions, as required, to ensure transparency and a unified approach for providing sewer service. (Findings 4-5, 49)
F40: Because some of the District service area lies within the City limits, it is conceivable that some of the District's ESSUs could be used on City authorized projects in this overlap area. 41 .Approximately one-half of the District's sewer accounts for domestic and commercial sewer billings lie within the City limits, in the overlap area.
Related Recommendations (2)
R17: the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40)
R47: 12. the City and District notify and keep each other fully informed of all activities that might directly or indirectly impact the other such as planning for boundary changes, annexation of new areas, proposed subdivisions, collection system extensions, new connections, major maintenance projects, "will serve" commitments, permits for pre-treatment facilities, or any legal or financial issues. (Findings 38, 43) 13. the City and District adopt similar, if not identical policies, procedures, standards for construction, user rates, and miscellaneous fees and charges wherever possible. (Findings 5-6, 19) 14.the City, while exercising its obligations of the Participation Agreement and amendments thereto retain sole authority, discretion and responsibility for selection and employment of administrative, operating and maintenance personnel for the unified City/District system along with the right to establish appropriate pay schedules. (Finding 5) 15. the District, apart from its contractual relationship with the City under existing Agreements, retain its identity, and continue exercising power and discretion as an independent special district. (Findings 37, 43) 16. the City employ only appropriately certified operating and maintenance personnel including those in direct supervisory or administrative positions in the sewer division of the City's Public Works Department. (Findings 5, 7) 17. the City and District hold joint planning and budget review sessions on a quarterly basis as a minimum and more often as needed. (Findings 28, 29, 34, 38-40) 18. the District continue to hold regular monthly meeting dates and special meetings as needed. (Finding 28) 19. the City and District re-visit the Participation Agreement and subsequent amendments, review their respective needs for efficient, cost-effective and transparent operations and make revisions, as required, to ensure transparency and a unified approach for providing sewer service. (Findings 4-5, 49)
F42: The City maintains separate revenue accounts for domestic and commercial sewer billings for the City and the District.
F43: As an independent special district, the District may: a procure serylces o enter into contracts and agreements ® incur debt » employ personnel • adopt resolutions and ordinances • initiate and approve annexations ® approve and construct sewer extensions and new connections o establish user rates, fees and charges in accordance with existing agreements with the City. The District is obligated to budget and fund such activities from sources outside of Operating and Maintenance account 612.
F44: Account 612 fund balances found to be in excess of annual operating and maintenance needs are accumulated in the sewer enterprise fund and are available for budgeting in future years.
F45: The City currently estimates system maintenance and repair costs rather than tracking actual data to allocate these expenses.
Related Recommendations (1)
R11: the City Council and District Board conduct a joint mid-year sewer budget hearing no later than January 31 each year to compare actual revenue and expenditures with budget estimates, review the status of budgeted activities and consider maintenance and capital improvement goals. (Findings 4-5, 45- 47)
F46: In some instances, work crews and vehicles or other major equipment or machinery that are paid for and maintained partially or wholly with merged funds are used by other City Departments.
Related Recommendations (1)
R11: the City Council and District Board conduct a joint mid-year sewer budget hearing no later than January 31 each year to compare actual revenue and expenditures with budget estimates, review the status of budgeted activities and consider maintenance and capital improvement goals. (Findings 4-5, 45- 47)
F47: The District and City have not engaged in adequate joint long-range planning. They have been largely reactive in actions taken regarding major maintenance and capital improvements, new sewer sen/ices, project planning and annexations.
Related Recommendations (1)
R11: the City Council and District Board conduct a joint mid-year sewer budget hearing no later than January 31 each year to compare actual revenue and expenditures with budget estimates, review the status of budgeted activities and consider maintenance and capital improvement goals. (Findings 4-5, 45- 47)
F48: Many of the findings cited in this report should be addressed in the City's Sanitary Sewer Management Plan (SSMP) and the Municipal Service Review currently underway by the Local Area Formation Commission (LAFCO). ' Additional information may be found on the LAFCO website at www.mendolafco.org
F49: On August 14, 2008, a joint Ad Hoc committee of the City and the District published a report including nineteen recommendations for amendments to the Participation Agreement.